Skip to main content

Mott MacDonald’s motorway to motorway metering

Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.
December 20, 2017 Read time: 2 mins
The M2M pilot will operate during 2018 and be monitored to evaluate the benefits.
2579 Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for 8100 Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.


Large volumes of eastbound traffic on the M62 can cause weaving problems, leading to congestion between junctions 10 and 11. This problem is exacerbated by traffic joining the motorway from the M6 northbound and southbound link roads. This merging traffic causes flow breakdown on the M62 through the Croft Interchange, which in turn causes queues to form along the motorway to junction 9.

The M2M scheme combines the use of two standard technologies in an innovative way. Variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62 eastbound are integrated to make best use of the available road capacity. These are set in response to prevailing traffic conditions, with information displayed on overhead gantries, using advanced motorway indicators and variable message signs. Mott MacDonald developed the algorithms which coordinate the separate systems. Where no mandatory speed restriction is displayed the national speed limit will apply.

Stuart Scott, Mott MacDonald’s project principal, said, “Highways England is committed to building upon the success of its existing smart motorway programme. The M2M scheme increases the resilience of the overall network, with the benefit to the road user of smoother traffic flows, improved journey times and increased quality of information provided.”

“By utilising the latest technologies and making use of the existing capacity of the link roads, the M2M scheme is a lower cost solution than conventional widening programmes. Additionally, it does not require additional road-space, leading to a low environmental impact during construction while delivering a positive impact during operation,” Scott added.

For more information on companies in this article

Related Content

  • Minister gives green light for UK road schemes
    May 8, 2012
    Roads Minister Mike Penning yesterday gave the green light for development work to be carried out on six new major UK road schemes. The development work, which will take place over the next three years, aims to prime the road schemes for completion in the early years of the next spending review period (post 2015). The six proposed road schemes, which aim to boost economic growth as part of the Government’s National Infrastructure Plan, are:
  • Cleveland Bridge wins UK flyover contract
    March 26, 2020
    Cleveland Bridge has won a major contract for a flyover in the UK.
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon