Skip to main content

Mott MacDonald’s motorway to motorway metering

Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.
December 20, 2017 Read time: 2 mins
The M2M pilot will operate during 2018 and be monitored to evaluate the benefits.
2579 Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for 8100 Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.


Large volumes of eastbound traffic on the M62 can cause weaving problems, leading to congestion between junctions 10 and 11. This problem is exacerbated by traffic joining the motorway from the M6 northbound and southbound link roads. This merging traffic causes flow breakdown on the M62 through the Croft Interchange, which in turn causes queues to form along the motorway to junction 9.

The M2M scheme combines the use of two standard technologies in an innovative way. Variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62 eastbound are integrated to make best use of the available road capacity. These are set in response to prevailing traffic conditions, with information displayed on overhead gantries, using advanced motorway indicators and variable message signs. Mott MacDonald developed the algorithms which coordinate the separate systems. Where no mandatory speed restriction is displayed the national speed limit will apply.

Stuart Scott, Mott MacDonald’s project principal, said, “Highways England is committed to building upon the success of its existing smart motorway programme. The M2M scheme increases the resilience of the overall network, with the benefit to the road user of smoother traffic flows, improved journey times and increased quality of information provided.”

“By utilising the latest technologies and making use of the existing capacity of the link roads, the M2M scheme is a lower cost solution than conventional widening programmes. Additionally, it does not require additional road-space, leading to a low environmental impact during construction while delivering a positive impact during operation,” Scott added.

For more information on companies in this article

Related Content

  • Super paving with Aggregate Industries’ SuperThin
    February 21, 2019
    Aggregate Industries’ contracting division recently laid a total of 1,800 tonnes of an ultra-low noise asphalt at Brampton Hut Services in Huntingdon in one weekend. Section 1 of Highways England’s A14 Cambridge-to-Huntingdon Improvement Scheme will see 21km of the road upgraded to three lanes in each direction and is expected to cut journey times by up to 20 minutes. The pavement works at Brampton Hut motorway services specified minimum sound level requirements of -7.5db (A). The limits are designed
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • UK motorway bridge work
    June 10, 2025
    A new bridge now spans the UK’s busy M6 motorway.
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl