Skip to main content

Motorway surveys for Spot the robotic dog

Spot, from Boston Dynamics, is being trialled by National Highways, BAM Ritchies - the ground engineering division of BAM Nuttall - and AECOM.
By David Arminas March 1, 2024 Read time: 3 mins
Spot the dog: last seen snuffling alongside an English motorway, travelling through brush, trees and other vegetation (image courtesy National Highways)

National Highways says it has been using Spot, a “robotic dog”, for surveying the agency’s land adjacent to motorways in southwest England.

Spot, a 25kg creation from Boston Dynamics, is being trialled by National Highways, BAM Ritchies - the ground engineering division of BAM Nuttall - and AECOM to inform forthcoming operational work. The robotic dog’s eye view is being employed to capture data remotely in difficult-to-reach locations and across various terrains alongside the motorway and major A roads, according to national Highways.

These access-constrained sites include steep-sided embankments and natural slopes, slopes beneath tree canopies or otherwise obscured by vegetation, culverts and under bridges and other structures. These are areas where it is difficult and sometimes unsafe for geotechnical inspectors to reach.

Spot is to help meet the standards set out in the UK’s Design Manual for Roads and Bridges and reduce the frequency of physical walkover surveys by inspectors and the need for costly and disruptive traffic management.

Boston Dynamics is an American engineering and robotics design company founded in 1992 as a spin-off from the Massachusetts Institute of Technology and whose parent company is now Hyundai Motor Company. The company creates advanced robots that mimic human and animal movements. Boston Dynamics’ other robots include BigDog, Atlas and Handle. Since 2019, Spot has been commercially available, making it the first commercially available robot from Boston Dynamics.

National Highways, a wholly government-owned company, said that Spot has been put through its paces by the AECOM and BAM teams at its Development Centre at Moreton-in-Marsh last summer. The robotic dog’s capabilities were tested over a number of highways settings, across differing ground conditions and on earthworks of various gradients, heights and materials.

The four-legged robot’s first ‘live trial’ was alongside the M5 in Somerset county, using cameras and a Leica BLK ARC lidar scanner. National Highways said it is keen to explore and test the technology further throughout the year.

“The initial proof-of-concept testing has been encouraging and we’re now live-trialling the robotic tool with a view to using it with our contractors in future survey work,” said Guy Swains, engineering manager with National Highways’ South West Geotechnical team.

“It’s about finding the right applications and the team is focused on realising Spot’s potential,” said Matt Ewing, business development manager with BAM Ritchies.

The trials follow several National Highways research and development projects led by the ARUP/AECOM consortium, to better integrate remote survey techniques into geotechnical asset management practice.

The initiative comes within months of National Highways, the University of Cambridge and supply chain companies launching the Roads Research Alliance to shape the development of innovation within the highways industry over the next five years.

For more information on companies in this article

Related Content

  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • Nynas and Shell in Hanson UK bio-binder trial
    March 6, 2023
    Hanson UK is using Nynas’s biogenic binder Nypol RE in one asphalt mixture and Shell’s new bio-component binder Cariphalte CarbonSink in the second mix.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Innovative GIS software offerings
    July 18, 2012
    The latest construction software developments can speed the construction process overall, Adrian Greeman reports Construction software is by its very nature a very fast moving technology, with new systems coming to the market almost continuously. There are some key developments however, such as major new product launches and market trends. One of the most important developments in the road design sector is the launch of the Bentley Systems V8i versions of its software, including its road design applications