Skip to main content

More EU money for Fehmarn Belt Link

The money underlines the importance of the 17.6km Fehmarnbelt tunnel project for the entire European road network.
By David Arminas July 4, 2022 Read time: 2 mins
The tunnel will consist of 79 standard 217m-long elements around 10m high with two highway tubes, one emergency tube and two rail tubes (image courtesy of Femern)

The European Union has allocated €537.53 million (US$567.35 million) to the Fehmarn Belt Link in Denmark up to 2027, according to Denmark’s ministry of transport. The time

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The money underlines the importance of the 17.6km Fehmarnbelt tunnel project not only for the Danish road network but the entire European transport network, said Trine Bramsen, minister of transport.

When finished it will be the longest ever constructed, surpassing the 13.5km Marmaray Tunnel of the Bosphorus in Turkey. It will consist of 79 standard 217m-long elements around 10m high with two highway tubes, one emergency tube and two rail tubes.

There will be 10 service elements, each 85.7m-long but both wider and higher and with a subfloor to house technical and servicing equipment. The deepest section of the Fehmarn Belt Trench, into which the tunnel elements will be laid, will be 35m.

The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process had been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

Danish company Femern is responsible for construction of the link. A tunnel element fabrication yard and a works harbour has been built in Rødbyhavn, as well as a tunnel portal on Lolland.

Work is progressing at a cement facility at the Rødbyhavn construction site on the Danish island of Lolland. When finished, the factory will produce concrete undersea tunnel elements for the project.

The Lolland factory will cast all 89 of the project’s 217m-long concrete tunnel segments with each segments weighing more than 73,000 tonnes. The halls of the factory will have strict climate control, ensuring the segments harden evenly.

The first of the six production lines is expected to be ready by the end of the year, with the first segments expected to be towed by barge to their respective immersion points next year.

The road and rail tunnel’s developer is Femern A/S, while the main contractor on the €10 billion project is Fehmarn Link Contractors JV.

In June last year, SBM Mineral Processing was awarded the biggest contract in the company’s history – to supply six concrete mixing plants that will produce around 3 million cubic metres of concrete.

For more information on companies in this article

Related Content

  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • German court decides for Fehmarnbelt
    November 18, 2020
    Danish state-owned company Femern is responsible for the 18km road-rail tunnel.
  • Consortia line up for Denmark’s Storstrom Bridge project
    February 12, 2015
    Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The new bridge, likely to cost around €565 million including the cost of demolishing the old bridge it will replace, is expected to open by 2021, a
  • Progress for planned Denmark-Germany immersed tunnel
    October 30, 2013
    A Danish company, Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster