Skip to main content

More cash for Alberta Economic Corridors

The work is being done within the Alberta Transportation and Economic Corridors programme that develops trade corridors for transportation to markets within and outside the province.
By David Arminas April 10, 2024 Read time: 2 mins
Alberta Transportation and Economic Corridors: in it for the long haul, near the town of Cochrane (image © David Arminas/World Highways)

The western Canadian province of Alberta has budgeted around US$1.4 billion this year for planning, designing and constructing major bridge and highway projects.

The work is being done within the Alberta Transportation and Economic Corridors programme. Economic corridors are trade corridors that provide vital links to markets in and out of the province, supporting economic, social and environmental activity. These trade corridors may include varying types of linear infrastructure.

Corridors can involve a broad range of infrastructure including transportation, energy, power, telecommunications and other utilities. In addition to physical infrastructure, corridors include service markets and the coordination of regulations and policies across multiple jurisdictions and sectors.

The 2024 budget also sets aside $112 million over three years for 56 engineering projects, with nearly another $75 million for a further 38 projects over the same period.

The funded projects include Highway 3 twinning, Highway 11 twinning, Highway 881 safety and road improvements, Highway 22/1A interchange at Cochrane, Highway 40 twinning, Highway 201 Bow River Bridge, Deerfoot Trail upgrades, Terwillegar Expansion, Highway 60 capital improvements, Highway 40 grade widening, a new intersection at Highway 16A and Range Road 20, Highway 2 Balzac Interchange Replacement, Highway 63 twinning, and the Vinca Bridge replacement.

Among the economic corridors is the High Load Corridor, also called the Oversize and Overweight Corridor. This is a network of designated highways where overhead utilities are raised or buried to accommodate high loads, and in many cases, heavy, wide and long loads. About 150,000 oversized and overweight permits are issued annually in Alberta. Corridor development began in 1985. It now includes around 5,000km of Alberta’s provincial highway network.

Related Content

  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • IRF Global Road Achievement Awards (GRAA) Winning Project: Morava Corridor Motorway
    April 29, 2025

     

    Bechtel and ENKA each boast rich histories, and together, possess nearly 200 years of combined experience—an impressive feat in today’s competitive landscape. For 35 years, the joint venture has tackled some of the industry’s most challenging motorway projects. The Morava Corridor Motorway Project’s program management exemplifies a commitment to excellence, representing a complex endeavor that few can undertake.  

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow