Skip to main content

Moldova gets EBRD loan for M1, M2 upgrades

The work will enhance transport connectivity by strengthening core transport links with a focus on the pan-European TEN-T network.
By David Arminas August 28, 2023 Read time: 3 mins
A ring road around the Moldovan capital Chisinau is one highway that will benefit from the latest EBRD load for road improvements (image © Calin Stan/Dreamstime)

The European Bank for Reconstruction and Development (EBRD) will lend Moldova €150 million for the rehabilitation and widening of the M1 and M2 highways.

The money will be loaned in two tranches. The first will be for section two of the M2 ring road around the capital city Chisinau. The second tranche will cover rehabilitation of the M1 Chisinau-to-Leuseni road.

The 146km-long M1 highway connects the border with Ukraine near Dubău to the border with Romania at Leușeni, passing through Chișinău and Dubăsari. It forms part of the European routes E58, E581 and E584.

The 185km-long M2 highway connects Chișinău to Soroca via Orhei, then to the border with Ukraine at Cosăuți. It forms a short segment of European route E584 of the International E-road network, north of Chișinău. But the country has under 50km of motorway that is of European standard for the definition.

The EBRD said in a press release that the project will enhance transport connectivity by strengthening core transport links with a focus on the pan-European TEN-T network. The TEN-T policy is aimed at developing coherent, efficient, multimodal and high-quality transport infrastructure across the European Union. It comprises railways, inland waterways, short sea shipping routes and roads linking urban nodes, maritime and inland ports, airports and terminals.

In effect, the rehabilitation of the M1 and M2 “will support country and regional connectivity through the rehabilitation of priority roads between Moldova, the European Union and Ukraine”.

The bank also noted that the project is consistent with the EU-Ukraine Solidarity Lanes facility because the work will focus on major roads that will allow for the import and export of goods with Ukraine. With the Black Sea route closed by the Russian military, 20 million tonnes of grain were trapped in Ukraine before last summer. The European Commission launched the Solidarity Lanes Action Plan in May 2022 to establish alternative logistics routes via rail, road and inland waterways.

The loan will be made to the Republic of Moldova with the ministry of infrastructure and regional development’s State Road Administration (ASD) as the client for the work. Design costs for the upgrades, however, will be handled by the client, according to the EBRD.

Romanian-speaking Moldova, with a population of only 2.5 million, was part of the Soviet Union until the breakup in 1992. The capital city Chişinău has a population under 600,000. Moldova is landlocked - bordered by Romania to the west and Ukraine to the north, east and south. Meanwhile, the unrecognised breakaway state of Transnistria lies across the Dniester River on Moldova’s eastern border with Ukraine.

According to the International Monetary Fund, Moldova is the second poorest country in Europe by GDP per official capita after Ukraine and much of its GDP is dominated by the service sector. A recent report by the ASD noted that there are 12,730km of roads, of which 10,937km are paved. However, the main means of transportation in Moldova are railways - 1,138km of track.

Last autumn, the EBRD agreed to lend €100 million to Moldova to finance road rehabilitation near Ukraine border. It covers 46km of highway between the towns of Soroca and Arionesti and 9.5km from Arionesti to the border with Ukraine at Otaci.

The €100 million loan is on top of an existing €150 million loan in 2013 for road upgrades.

Also last year, Moldova was granted candidate status to join the European Union.

Related Content

  • European Commission launches €350mn TEN-T proposal calls
    December 12, 2013
    The European Commission has launched proposal calls worth €350 million for TEN-T (the Trans-European Transport Network) related projects. The proposal calls relate to all EU Member States and TEN-T projects for road, air, railways, maritime and inland waterways. Commission vice president Siim Kallas, responsible for transport, said, “With the 2007-2013 budgetary period coming to an end, we will make the best possible use of these TEN-T Calls for Proposals to make sure European transport infrastructure sup
  • Breakthrough on Slovakia’s D1 tunnel near Zilina
    December 12, 2016
    Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
  • Loan for Bosnia motorway project
    May 9, 2019
    A loan agreement has been signed to help pay for a new motorway project in Bosnia and Herzegovina. The European Bank for Reconstruction and Development (EBRD) is providing the Bosnia and Herzegovina Government with a loan worth €210 million for next stage of Corridor Vc project. According to the EBRD, Bosnia and Herzegovina’s further economic integration with the Western Balkans and the rest of Europe will take an important step forward due to this loan for. The development of Corridor Vc is a strategic
  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.