Skip to main content

Mobile LiDAR equipment working in Pennsylvania

Michael Baker International completed a US$7 million project for the US state of Pennsylvania collecting nearly 20 million data fields from over 8,600 traffic signals During the year-long project, the engineering, planning and consulting business worked with PennDOT’s Traffic Signal Asset Management System. It collected nearly 20 million data fields for each of the 8,623 traffic signals analysed. The data has populated a centralised database to support PennDOT’s planning, design, maintenance and oper
February 6, 2017 Read time: 2 mins
Michael Baker International completed a US$7 million project for the US state of Pennsylvania collecting nearly 20 million data fields from over 8,600 traffic signals

During the year-long project, the engineering, planning and consulting business worked with 4907 PennDOT’s Traffic Signal Asset Management System. It collected nearly 20 million data fields for each of the 8,623 traffic signals analysed.

The data has populated a centralised database to support PennDOT’s planning, design, maintenance and operational decision-making.

“Pennsylvania is unique in that its traffic signals are owned and maintained by Commonwealth [state] municipalities and not PennDOT, which has resulted in varying standards of maintenance and operation care from municipality-to-municipality,” said Steve Barber, vice president and Harrisburg office executive for Michael Baker International.

Michael Baker team employed its mobile Light Detection and Ranging (LiDAR)-equipped vans to efficiently collect all necessary data. Since all LiDAR data was collected at the intersections, PennDOT can now review data on other non-signal infrastructure assets at the intersections.

In 2013, Pennsylvania passed Act 89 that calls for an additional $2.4 billion funding over five years. PennDOT identified traffic signals as an area of necessary investment for this spend.

PennDOT established the Green Light-Go programme to manage the dedicated traffic signal funding and corresponding maintenance and operations projects. A by-product of this programme was implementation of the Traffic Signal Asset Management System, for which Michael Baker led the data collection through coordination with the PennDOT Central Office and each of their engineering districts.

For more information on companies in this article

Related Content

  • Roads are an asset that society cannot live without says the European Road Federation’s new long-term safety manifesto
    April 11, 2013
    Roads are an asset that society cannot live without argues a new manifesto out this month from the European Road Federation, as the lobby group launches a new policy for long-term, effective management of a safe and efficient European road network. Roads represent an incomparable link in the global chain of transport and mobility says the European Road Federation (ERF). The condition of the roads in Europe might look satisfactory at first glance, but what could appear acceptable on the surface can be hiding
  • Surveying utilities across the UK
    December 11, 2024
    Ordnance Survey is surveying utilities across the UK.
  • Global credit squeeze impacts Australia's road construction
    July 13, 2012
    Roads Australia steps up in policy debate as road construction feels the pinch of the credit squeeze, as Mark Bowmer (RA media director) reports Like all markets around the world, Australia is feeling the effects of the global credit squeeze and its impact on the delivery of major infrastructure projects such as roads. In Sydney, for example, lack of funding (both from government and private sources) is seen as the major stumbling block to the construction of a much-needed eastern extension to Sydney's main
  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the