Skip to main content

Metrostav Norge's Faroe tunnel on target

Metrostav Norge won the contract to connect the villages of Fámjin and Ørðavík on Suðuroy Island, part of the Faroes, in 2022.
By David Arminas December 18, 2023 Read time: 2 mins
Every tunnel helps: around 80% of the Faroes population is connected by tunnels (image © Niels Melander/Dreamstime)

Work continues by the Czech construction firm Metrostav on a 1.2km tunnel in the Danish Faroe Islands.

The Metrostav Group, through its subsidiary Metrostav Norge, won the contract to connect the villages of Fámjin and Ørðavík in the autumn of 2022. Less than 90 people live in the area which is on Suðuroy Island, one of  in the Faroes island group.

The tunnel is being built using the Norwegian drill-and-blast tunnelling method. Around 220 of the company's employees are on site. According to the company, the deal is worth around €8.8 million. The tunnel is being excavated from a portal located above the village of Ørðavík. Included in the work of Metrostav Norge is grouting and the installation of around 9,000m² water and frost insulation. Around 4,275m³ of shotcrete will have been used upon completion.

The main client is Landsverk, the Faroes highways agency responsible for building, operating and maintain the country’s highway infrastructure.

The Faroe island group in the North Sea is around 320km north of the UK and about halfway between Norway and Iceland. The country is an autonomous  self-governing region of Denmark and legislates and governs independently in a wide range of areas. The country is rugged and has a subpolar oceanic climate - windy, wet, cloudy and cool. Temperatures are moderated by the Gulf Stream, averaging above freezing throughout the year.

Road tunnels – there are no rail services in the island group – are an important part of the transport infrastructure. Around 80% of the population is connected by tunnels through the mountains and between the islands, bridges and causeways that link together the three largest islands and three other islands to the northeast. While the other two large islands to the south, Sandoy and Suðuroy, are connected to the main area with ferries, the small islands Koltur and Stóra Dímun have no ferry connection, only a helicopter service

For more information on companies in this article

Related Content

  • Bring forward tunnel work, urges the head of Norwegian national contractor Mesta
    April 13, 2020
    Marianne Bergmann Røren said there are 55 tunnels needing upgrading before 2025.
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • A new €1.2 billion highway for Denmark
    May 27, 2024
    A new €1.2 billion highway is planned for Denmark.