Skip to main content

Metrostav Norge's Faroe tunnel on target

Metrostav Norge won the contract to connect the villages of Fámjin and Ørðavík on Suðuroy Island, part of the Faroes, in 2022.
By David Arminas December 18, 2023 Read time: 2 mins
Every tunnel helps: around 80% of the Faroes population is connected by tunnels (image © Niels Melander/Dreamstime)

Work continues by the Czech construction firm Metrostav on a 1.2km tunnel in the Danish Faroe Islands.

The Metrostav Group, through its subsidiary Metrostav Norge, won the contract to connect the villages of Fámjin and Ørðavík in the autumn of 2022. Less than 90 people live in the area which is on Suðuroy Island, one of  in the Faroes island group.

The tunnel is being built using the Norwegian drill-and-blast tunnelling method. Around 220 of the company's employees are on site. According to the company, the deal is worth around €8.8 million. The tunnel is being excavated from a portal located above the village of Ørðavík. Included in the work of Metrostav Norge is grouting and the installation of around 9,000m² water and frost insulation. Around 4,275m³ of shotcrete will have been used upon completion.

The main client is Landsverk, the Faroes highways agency responsible for building, operating and maintain the country’s highway infrastructure.

The Faroe island group in the North Sea is around 320km north of the UK and about halfway between Norway and Iceland. The country is an autonomous  self-governing region of Denmark and legislates and governs independently in a wide range of areas. The country is rugged and has a subpolar oceanic climate - windy, wet, cloudy and cool. Temperatures are moderated by the Gulf Stream, averaging above freezing throughout the year.

Road tunnels – there are no rail services in the island group – are an important part of the transport infrastructure. Around 80% of the population is connected by tunnels through the mountains and between the islands, bridges and causeways that link together the three largest islands and three other islands to the northeast. While the other two large islands to the south, Sandoy and Suðuroy, are connected to the main area with ferries, the small islands Koltur and Stóra Dímun have no ferry connection, only a helicopter service

For more information on companies in this article

Related Content

  • Trapped workers rescued from collapsed Indian tunnel
    November 29, 2023
    Construction workers in India have been rescued from a collapsed tunnel.
  • Argentina-Chile Agua Negra tunnel passes key preliminary stage
    February 17, 2015
    The Argentinean Senate is giving preliminary approval for the Agua Negra tunnel project. This is a key stage in the planning for the tunnel, which will link Argentina and Chile. The preliminary stages involve discussing the Maipu Treaty and various procedural agreements between the governments of both countries, an important step forward from the frosty relations between the two nations in the past. Further discussions will be held by the authorities in Argentina while the Chilean Government will be evaluat
  • Mott MacDonald to upgrade major west Spain highway
    July 17, 2013
    Mott MacDonald (MM) has been appointed by Sociedad Concesionaria Autovía de la Plata as lender’s technical advisor for a major highway upgrade in western Spain. The project involves the design, construction, maintenance, operation and finance of a 49km two-lane dual carriageway between Benavente and Zamora. The new road, which will bypass the existing single carriageway through local villages, will form the last section of the 809km A-66 Autovía de la Plata highway, connecting Gijon in the north to Seville
  • Skanska to start Black Cat upgrade
    November 30, 2023
    The A428 upgrade work in England was awarded in 2021 to create a 16km dual carriageway to improve journeys between Milton Keynes, Bedford and Cambridge, near London.