Skip to main content

M27 contract for McCann

Highways England has awarded an M27 contract to McCann.
By MJ Woof July 29, 2020 Read time: 2 mins
Contractor McCann is working on the project to upgrade the M27 in Southern England

Nottingham-based civil and electrical engineering firm McCann is working on a major contract for Highways England. The work is for the £244 million smart motorway project between junctions 4-11 of the M27.

The scheme will deliver sophisticated smart motorway technology to the major route along England’s south coast. This will help to improve road safety, cut congestion and reduce travel times between Southampton and Portsmouth, two of Hampshire’s busiest and largest cities.

Works started on the scheme in January 2019. Meanwhile, McCann started its work on the project in April 2020. The firm is installing and upgrading motorway communications systems, street lighting and traffic signage as part of the Bam Nuttall Morgan Sindall Joint Venture (BMJV).

The M27 falls within Highways England’s Area 3 Asset Support Contract and the South East Regional Control Centre. It not only connects Southampton and Portsmouth, but provides quick links to the M3 at junction 4 - with access to Winchester and Basingstoke.

As well as congestion and travel time improvements, Highways England has identified several additional benefits from the scheme including facilitating economic growth through increased motorway capacity and where possible, enhancing the local environment while reducing the scheme's impact on the environment.

The 25km stretch will be widened to four lanes with changes to junction slip roads as well as new CCTV cameras, electronic information signs and signals, emergency areas and the hardening of the central reservation. McCann is working on the scheme until March 2021 to install all necessary communications and signage, as well as LED street lighting to improve road safety alongside associated infrastructure.

For more information on companies in this article

Related Content

  • SWARCO sets up live-lane running in Germany
    February 28, 2023
    SWARCO’s system spans 2.8km along the hard shoulder of the A8 motorway between Karlsruhe and Karlsbad in southwest Germany.
  • Mott MacDonald delivers asset monitoring solution
    June 10, 2021
    Mott MacDonald is delivering an asset monitoring solution for Highways England.
  • IAM suggests confusion over UK’s SMART motorways
    April 13, 2015
    The Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion exists amongst UK drivers on how best to use SMART motorways. These were officially introduced around this time in 2014 to replace Managed Motorways as the solution to the UK’s congested major routes. However concerns have been raised over the safety of the SMART motorways. England’s first all-lane running motorway, without a hard shoulder, was the 2.5km stretch of the M25 between junctions 23 and 25. Complete schemes
  • Upgrade work starts on junction of London’s orbital motorway M25
    February 20, 2015
    Work has started on a €136 million road improvement project on the UK’s London ring road, the M25 motorway. Crews from Balfour Beatty and Skanska have moved onto the interchange between the A13 national road and the M25 at junction 30 near Thurrock in the county Essex. The A13 on approach to the junction will be widened to four lanes in each direction and the junction itself will have dedicated link roads between the M25 and the A13. “Traffic at the junction is expected to grow by up to a quarter b