Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
April 10, 2012 Read time: 1 min
Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Multi-million dollar investment in Indonesian road toll projects
    July 12, 2012
    Millions of US dollars are being poured into new and expanding toll road projects in Indonesia. Wijaya Karya (Wika), the Indonesian government-owned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35million (IDR 340.80bn) and US$23.98million (IDR 225bn), respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months.
  • Indonesian toll roads
    August 13, 2012
    ijaya Karya (Wika), the Indonesian governmentowned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35 million and $24 million, respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months. The operator of the Tangerang- Merak Toll Road, Marga Mandala Sakti (Marga Mandala), will be allocating U$17 million to increase the toll road’s capacity. It
  • Indonesia tollroad project
    May 23, 2025
    Work on key Indonesian tollroad projects are well underway.
  • Indonesia road projects being planned
    February 7, 2017
    Three toll road projects are being planned in Indonesia. Financing for the projects is being provided through the Indonesia Infrastructure Guarantee. In all, the three projects are worth a total of US$2.17 billion. The toll roads are from Tebing Tinggi to Parapat, from Cileunyi-Sumedang to Dawuan and from Serang to Panimbang. The contracts are expected to be signed in March 2017.