Skip to main content

Key project for India

In India a major highway deal has been agreed for a road project in Gujarat worth an estimated US$810.8 million.
February 15, 2012 Read time: 1 min
In India a major highway deal has been agreed for a road project in Gujarat worth an estimated US$810.8 million. The project will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening a 102km section of NH-8 from Ahmedabad-Vadodara to six lanes. The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway. The work is expected to take three years to complete. The 25-year concession deal for the project has been agreed between IRB Ahmedabad Vadodara Super Express Tollway unit of 2700 IRB Infrastructure Developers and 292 National Highways Authority of India (NHAI).). Meanwhile, a joint venture is being established for a 25.5km road project to connect Kattupalli port and Ennore port in Chennai. The joint venture will comprise Ennore Port, L&T Ship Building and 2701 Tamilnadu Industrial Development Corporation (TIDCO) and the road will be constructed on a build, operate and transfer basis. The project is expected to cost $81.5 million.

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Immersed tube Fehmarnbelt Tunnel approved
    February 21, 2012
    The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans