Skip to main content

Key French highway upgrade deal for consortium

The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.
March 5, 2012 Read time: 2 mins
The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.

The 40 year concession is for the financing, design, development, widening, maintenance and operation of a section of Highway A63 between the towns of Salles and Saint-Geours-de-Maremne in southwest France. Atlandes' financing, worth around €1.1 billion, includes €200 million in shareholders' equity and nearly €900 million in credit from a pool of 10 European banks. The amount also comprises an initial entrance fee of €400 million, which corresponds to the transfer of existing infrastructure.

3635 Atlandes, which comprises 184 Colas Sud-Ouest, 3629 Screg Sud-Ouest, 3630 Spie batignolles, NGE, 2376 EGIS Projects, 3633 HSBC European Motorway Investments and 3634 DIF Infrastructure, will be in charge of project management. The €500 million development phase is for the upgrading of former National Route RN 10 to current environmental and highway standards and the widening of the 105km section to six lanes, to boost capacity and safety.

The work will be performed in a 41 month timeframe by a consortium including Colas Sud-Ouest and Screg Sud-Ouest, Valérian and NGE. Egis Exploitation Aquitaine, a subsidiary of Egis Road Operation, will maintain and operate the concession and will take on the Government employees who currently work on the section.

An open toll system will enable local traffic to use the highway section free of charge. Tolls for heavy vehicle traffic will be tailored based on emission levels to ensure that the most environmentally-friendly heavy goods vehicles pay less. Atlandes will be the first concession company ever in France to implement this type of modulating toll policy. Tolls will be charged, at reduced rates, as of October 2013, following the completion of the first phase of work. Full rates will be applied when the entire section is opened to traffic, due in July 2014. The preliminary studies carried out prior to the effective date of contract, such as for environmental protection, will make it possible to commence work as early in the third quarter of 2011.

Related Content

  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Paying for the roads we drive
    February 6, 2018
    All around the world, vehicle numbers are growing fast and existing roads are seeing increasing congestion. This rapid increase in vehicle ownership is particularly acute in the developing world. Reductions in actual vehicle purchase costs have resulted in an explosion in vehicle numbers using the roads. In the past, governments were able to fund road expansion programmes from their own sources. The most ambitious of these came when the US Government commenced construction of the Interstate system in 1956,