Skip to main content

Key French highway upgrade deal for consortium

The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.
March 5, 2012 Read time: 2 mins
The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.

The 40 year concession is for the financing, design, development, widening, maintenance and operation of a section of Highway A63 between the towns of Salles and Saint-Geours-de-Maremne in southwest France. Atlandes' financing, worth around €1.1 billion, includes €200 million in shareholders' equity and nearly €900 million in credit from a pool of 10 European banks. The amount also comprises an initial entrance fee of €400 million, which corresponds to the transfer of existing infrastructure.

3635 Atlandes, which comprises 184 Colas Sud-Ouest, 3629 Screg Sud-Ouest, 3630 Spie batignolles, NGE, 2376 EGIS Projects, 3633 HSBC European Motorway Investments and 3634 DIF Infrastructure, will be in charge of project management. The €500 million development phase is for the upgrading of former National Route RN 10 to current environmental and highway standards and the widening of the 105km section to six lanes, to boost capacity and safety.

The work will be performed in a 41 month timeframe by a consortium including Colas Sud-Ouest and Screg Sud-Ouest, Valérian and NGE. Egis Exploitation Aquitaine, a subsidiary of Egis Road Operation, will maintain and operate the concession and will take on the Government employees who currently work on the section.

An open toll system will enable local traffic to use the highway section free of charge. Tolls for heavy vehicle traffic will be tailored based on emission levels to ensure that the most environmentally-friendly heavy goods vehicles pay less. Atlandes will be the first concession company ever in France to implement this type of modulating toll policy. Tolls will be charged, at reduced rates, as of October 2013, following the completion of the first phase of work. Full rates will be applied when the entire section is opened to traffic, due in July 2014. The preliminary studies carried out prior to the effective date of contract, such as for environmental protection, will make it possible to commence work as early in the third quarter of 2011.

Related Content

  • Emovis wins Mont Blanc tolling deal
    December 19, 2024
    Emovis - part of Abertis Mobility Services - will supply the public company Mont Blanc Motorways and Tunnel - ATMB - with a free-flow tolling system in France’s Haute-Savoie region.
  • Italian highway deals moving ahead
    January 21, 2022
    Important Italian highway deals are moving ahead.
  • Mott MacDonald Grontmij is handling key improvement scheme in UK
    May 16, 2013
    The Mott MacDonald Grontmij joint venture is working on plans for a € 189 million (£160 million) upgrade of the A63 Castle Street in the UK city of Hull. The partners were appointed by the Highways Agency to develop proposals for the scheme, which is intended to reduce journey times to the Port of Hull, ease congestion and improve safety on the city centre section of the A63. The route is currently one of the busiest sections of road in East Yorkshire. This 1.5km dual carriageway runs in an east-west direct
  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A