Skip to main content

Key French highway upgrade deal for consortium

The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.
March 5, 2012 Read time: 2 mins
The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.

The 40 year concession is for the financing, design, development, widening, maintenance and operation of a section of Highway A63 between the towns of Salles and Saint-Geours-de-Maremne in southwest France. Atlandes' financing, worth around €1.1 billion, includes €200 million in shareholders' equity and nearly €900 million in credit from a pool of 10 European banks. The amount also comprises an initial entrance fee of €400 million, which corresponds to the transfer of existing infrastructure.

3635 Atlandes, which comprises 184 Colas Sud-Ouest, 3629 Screg Sud-Ouest, 3630 Spie batignolles, NGE, 2376 EGIS Projects, 3633 HSBC European Motorway Investments and 3634 DIF Infrastructure, will be in charge of project management. The €500 million development phase is for the upgrading of former National Route RN 10 to current environmental and highway standards and the widening of the 105km section to six lanes, to boost capacity and safety.

The work will be performed in a 41 month timeframe by a consortium including Colas Sud-Ouest and Screg Sud-Ouest, Valérian and NGE. Egis Exploitation Aquitaine, a subsidiary of Egis Road Operation, will maintain and operate the concession and will take on the Government employees who currently work on the section.

An open toll system will enable local traffic to use the highway section free of charge. Tolls for heavy vehicle traffic will be tailored based on emission levels to ensure that the most environmentally-friendly heavy goods vehicles pay less. Atlandes will be the first concession company ever in France to implement this type of modulating toll policy. Tolls will be charged, at reduced rates, as of October 2013, following the completion of the first phase of work. Full rates will be applied when the entire section is opened to traffic, due in July 2014. The preliminary studies carried out prior to the effective date of contract, such as for environmental protection, will make it possible to commence work as early in the third quarter of 2011.

Related Content

  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Private owners seek a buyer for the UK’s only toll road, M6 Toll
    February 15, 2016
    Britain’s only toll road, the motorway M6 Toll, is up for sale by its owners, a consortium of banks that hope to recover some of the €2.45 billion of debt. The 27 owners of M6 Toll, including Crédit Agricole, Commerzbank and Banco Espirito Santo, took over the 43km pay-as-you-go toll road from infrastructure group Macquarie in December 2013 after a debt restructuring. Midland Expressway Limited (MEL), part of Macquarie Atlas Roads, continues to operate the six-lane motorway around the English city of
  • Key Russian road construction complete
    December 5, 2016
    Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
  • Strasbourg bypass surveys halted over environmental concerns
    September 27, 2017
    Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France. The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.