Skip to main content

Kapsch wins Financier of the Year award in Poland

At this year’s "Financier of the Year" gala event in Warsaw, Poland, Kapsch was given an award for the efficiency of its fully electronic toll system viaTOLL in bringing in higher revenues than expected last year.
March 19, 2012 Read time: 2 mins

At this year’s "Financier of the Year" gala event in Warsaw, Poland, 259 Kapsch was given an award for the efficiency of its fully electronic toll system viaTOLL in bringing in higher revenues than expected last year. The modern toll system constructed by Kapsch for all vehicles over 3.5 tonnes in total weight has been in operation on the existing road network of around 1,560 km since 3 July 2011.

"This award means a lot to us, because we implemented the system in record time. We had less than eight months in which to complete the implementation of this challenging project", explains Michael Gschnitzer, sales director at Kapsch TrafficCom. "The sharp rise in revenues confirms the quality of our toll system."

"Financier of the Year" cited the precision of the fully electronic toll system as one of the main reasons for the award. According to the latest results, use of the toll system brought in higher-than-expected revenues last year. During the last six months, US$131 million was generated for road infrastructure projects – US$5.34 million more than planned. This positive outcome was decisive for the award, and the project was described by the jury as "the most efficient system for financing road-building projects in 20 years."

The Financier of the Year awards have been conferred for twelve years by the editorial team of the weekly finance magazine Gazeta Finansowa.

For more information on companies in this article

Related Content

  • Caterpillar’s strong financial performance for 2017
    January 26, 2018
    Caterpillar has announced strong fourth-quarter and full-year results for 2017. Sales and revenues in the fourth quarter of 2017 were US$12.9 billion, compared with $9.6 billion in the fourth quarter of 2016. Fourth-quarter 2017 loss was $2.18/share, compared with a loss of $2/share in the fourth quarter of 2016.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • VDMA questions emissions future
    February 28, 2012
    The German construction equipment manufacturer's association, the VDMA, has stated that the new EU-exhaust emission directive presents a major challenge for its members.
  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi