Skip to main content

Kapsch wins Financier of the Year award in Poland

At this year’s "Financier of the Year" gala event in Warsaw, Poland, Kapsch was given an award for the efficiency of its fully electronic toll system viaTOLL in bringing in higher revenues than expected last year.
March 19, 2012 Read time: 2 mins

At this year’s "Financier of the Year" gala event in Warsaw, Poland, 259 Kapsch was given an award for the efficiency of its fully electronic toll system viaTOLL in bringing in higher revenues than expected last year. The modern toll system constructed by Kapsch for all vehicles over 3.5 tonnes in total weight has been in operation on the existing road network of around 1,560 km since 3 July 2011.

"This award means a lot to us, because we implemented the system in record time. We had less than eight months in which to complete the implementation of this challenging project", explains Michael Gschnitzer, sales director at Kapsch TrafficCom. "The sharp rise in revenues confirms the quality of our toll system."

"Financier of the Year" cited the precision of the fully electronic toll system as one of the main reasons for the award. According to the latest results, use of the toll system brought in higher-than-expected revenues last year. During the last six months, US$131 million was generated for road infrastructure projects – US$5.34 million more than planned. This positive outcome was decisive for the award, and the project was described by the jury as "the most efficient system for financing road-building projects in 20 years."

The Financier of the Year awards have been conferred for twelve years by the editorial team of the weekly finance magazine Gazeta Finansowa.

For more information on companies in this article

Related Content

  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • The “rollercoaster in the dunes”: Circuit Park Zandvoort
    June 14, 2021
    Some projects are so specialist that there are hardly any construction companies with significant experience to draw on - another reason why it is so valuable to have a partner with the expertise and experience to take things forward. The rehabilitation and modification of the race track in Zandvoort was a project like this.
  • Wirtgen Group aims for €1.8bn 2012 sales and targets emerging markets
    September 25, 2012
    Wirtgen Group expects to achieve record net sales of €1.8 billion in 2012, according to joint company president Jürgen Wirtgen. The performance forecast for the German road building and quarrying equipment manufacturer – a slight rise on 2011 net sales of €1.76 billion – was revealed as Jürgen and brother and co-Wirtgen Group president, Stefan Wirtgen, told a press conference at the recent Wirtgen Mineral Technology Days event about the company’s sales push in emerging markets.
  • Wirtgen Group aims for €1.8bn 2012 sales and targets emerging markets
    September 25, 2012
    Wirtgen Group expects to achieve record net sales of €1.8 billion in 2012, according to joint company president Jürgen Wirtgen. The performance forecast for the German road building and quarrying equipment manufacturer – a slight rise on 2011 net sales of €1.76 billion – was revealed as Jürgen and brother and co-Wirtgen Group president, Stefan Wirtgen, told a press conference at the recent Wirtgen Mineral Technology Days event about the company’s sales push in emerging markets.