Skip to main content

Japan: End to weekday daytime expressway toll discounts in March 2014

Japan’s Ministry of Transport is to scrap weekday daytime toll discounts on some of the country’s expressways from late March 2014 after a poll discovered that they were failing to relieve traffic jams. A 30% discount is currently available to drivers on non-Osaka, Tokyo and its neighbouring area toll expressways operated by Central Nippon Expressway, West Nippon Expressway and East Nippon Expressway from 9am to 5pm. State subsidies are also allowing operators to offer further expressway toll discount
November 25, 2013 Read time: 1 min
Japan’s Ministry of Transport is to scrap weekday daytime toll discounts on some of the country’s expressways from late March 2014 after a poll discovered that they were failing to relieve traffic jams.

A 30% discount is currently available to drivers on non-Osaka, Tokyo and its neighbouring area toll expressways operated by Central Nippon Expressway, West Nippon Expressway and East Nippon Expressway from 9am to 5pm.

State subsidies are also allowing operators to offer further expressway toll discounts of 50% on weekdays from 5pm to 8pm and from 6am to 9am.

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours