Skip to main content

Ireland releases National Cycle Network plan

There are 85 corridors of routes designed to integrate future and existing greenways and other cycling infrastructure, such as the Eurovelo routes.
By David Arminas January 17, 2024 Read time: 2 mins
Ireland is already on part of the Eurovelo network by hosting a section of the 11,000km EV1, running along coastlines from Norway to the Iberian peninsula (image © Emile Van Baardwijk/Dreamstime)

The Irish government has released its National Cycle Network plan outlining how 3,500km of cycle routes will crisscross the country, serving around 2.8 million people.

Almost 90% of jobs and 80% of households in more than 200 villages, towns and cities as far north as Buncrana in County Donegal and as far south as Kinsale in County Cork are expected to be located within 5km of the network. There are 85 corridors of routes designed to integrate future and existing greenways and other cycling infrastructure, such as the Eurovelo routes.

According to the plan, released by Eamon Ryan, Ireland's minister of transport, the routes will also link to other transport hubs to ensure more comprehensive mobility for as many people as possible. The network will act as a "core spine" for Ireland’s towns and cities. Eamon also said that cycling infrastructure will be separate from motor traffic wherever possible.

The basic plan designates the urban network’s destinations as either primary, secondary or 'other' nodes.

Primary nodes are cities and large towns with populations of more than 20,000. These include Cork, Galway, Limerick, Bray, Portlaoise, Wicklow, Wexford, Letterkenny and Tralee.

Secondary nodes are towns with populations of 10,000 to 20,000, as well as major tourist attractions outside urban areas.

The ‘other’ nodes include small towns and settlements of fewer than 5,000 people, as well as educational and employment centres and transport hubs.

Around 400km of the network’s 3,500km are already in use while 900km of it are part of planed regional and national greenway programmes. The remaining 2,200km will be new routes.

Delivery of the plan will be in three phases; the first is already under way. The second phase consisting of around 660km will be rolled out between 2026 and 2030, while the final 2,510km should be open between 2031 and 2040.

The government is hoping the cycling network will help it achieve its target of reducing transport emissions by 51% by 2030.

Ireland is already home to part of a Eurovelo route, the 11,000km EV1. It route runs from North Cape in northern Norway and hugs the North Sea and Atlantic Ocean coastlines of western Europe going as far south as Spain and Portugal.

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.
  • Funding for Sri Lankan highway upgrade work
    July 8, 2014
    A loan from the Asian Development Bank (ADB) worth US$800 million will help pay for a series of major road upgrades in Sri Lanka. The remaining $106 million required for the project will be provided by the Sri Lankan Government. The funding will pay for works to 2,200km of provincial and local roads as well as 400km of national roads. The work will help provide proper road connections to around 1,000 villages, with the loan being supplied in a series of payments. The first $100 million payment will be made
  • Motorway upgrades for Galicia, including A-55
    May 27, 2024
    Oscar Puente, Spain's minister of transport and sustainable mobility, made the announcement, saying it will help the Trans-European Transport Network.