Skip to main content

IRD wins nation-wide FHWA contract

International Road Dynamics (IRD) has been awarded a contract for "weigh-in-motion (WIM) systems maintenance and data services" by the US Department of Transportation, Federal Highway Administration (FHWA).
March 1, 2012 Read time: 2 mins
3508 International Road Dynamics (IRD) has been awarded a contract for "weigh-in-motion (WIM) systems maintenance and data services" by the 2364 US Department of Transportation, 2410 Federal Highway Administration (FHWA). Under this contract, IRD will be issued task orders to provide maintenance, download data, and perform verification checks at existing Long-Term Pavement Performance (LTPP) Specific Pavement Study (SPS) WIM sites located across the United States and Canada. The contract is a task-order based, indefinite-delivery-indefinite-quantity agreement covering a forty-eight month period. The potential maximum value of the project is approximately US$4.7 million.

WIM sites maintained under this agreement provide high accuracy traffic and load data. Additionally, IRD camera systems will be deployed at select WIM locations which will cross-link vehicle images to corresponding vehicle records and enhance overall data collection.

The primary goal of the LTPP programme is to understand how and why pavements perform as they do in order to provide data and products that extend pavement life at a reasonable cost. Given the strong national interest in analysing the pavement performance data collected at the SPS sites, the FHWA established a national pooled fund study to increase the quantity and improve the quality of traffic data needed to support analysis projects.

The FHWA Office of Infrastructure Research and Development administers the Nation's LTPP program in cooperation with the 3510 American Association of State Highway and Transportation Officials (AASHTO), the National Academy of Science, and State Highway Agencies.

"We have been working directly with FHWA on LTPP installations and maintenance since 2004," commented Terry Bergan, IRD president and CEO. "We are looking forward to extending our long term, successful relationship and consider this a very significant project for IRD as a nation-wide, multi-year, traffic data services provider."

Related Content

  • Joint venture to conduct US road study
    January 3, 2017
    A joint venture comprising Cambridge Systematics and WSP | Parsons Brinckerhoff will carry out a major Interstate study for the US. The joint venture partners were selected by the National Academies of Sciences, Engineering, and Medicine (National Academies). The future interstate study is mandated in Fixing America's Surface Transportation Act of 2015 (FAST Act). The FAST Act calls for the National Academies’ Transportation Research Board (TRB) to conduct “... a study on the actions needed to upgrade a
  • The acronym syndrome
    July 31, 2012
    Those who navigate the labyrinth that is the European Union and the numerous trade and research groups will be struck by the number of acronyms. In a short series, EUROFILE gives a snapshot of those engaged in the roads industry. In this issue we look at FEHRL (Forum of European National Highway Research Laboratories) based in Brussels, Belgium Established in 1989, FEHRL is made up directors of national research institutes: 30 in all from within the European Union, European Free Trade Association (EFTA) an
  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h