Skip to main content

IRD further strengthens business in Indiana

International Road Dynamics (IRD) has been awarded an additional Quantity Purchase Agreement valued at approximately US$9.9 million from the Indiana Department of Transportation. Under this agreement, IRD will be issued task orders to provide Weigh-in-Motion (WIM) and Virtual Weigh-in-Motion System (VWS) systems including site and sensor installation, maintenance, and repair. The systems and services supplied under this contract will provide high accuracy traffic and weight data for planning, roadway
September 15, 2015 Read time: 3 mins
3508 International Road Dynamics (IRD) has been awarded an additional Quantity Purchase Agreement valued at approximately US$9.9 million from the 2855 Indiana Department of Transportation.

Under this agreement, IRD will be issued task orders to provide Weigh-in-Motion (WIM) and Virtual Weigh-in-Motion System (VWS) systems including site and sensor installation, maintenance, and repair.

The systems and services supplied under this contract will provide high accuracy traffic and weight data for planning, roadway design and weight compliance purposes.

The contract is a task-order based agreement and there is no limit to the number of Quantity Purchase Awards (QPAs) to be released. The contract is a long-term commitment between IRD and Indiana that started on July 1 and runs to April 30, 2019. This award complements a previous QPA issued to IRD in June valued at US$3.8 million for IRD equipment, software and services.

Each system will include a WIM sensor array specified by INDOT as appropriate for the type of traffic data to be collected at that location. VWS systems will also provide image capture and support remote web access capability to provide more powerful realtime tools that can be utilised for commercial vehicle weight screening.

Under this contract there is also an opportunity for IRD to work closely with INDOT to provide system enhancements and upgrades through the life of the contract.

In March, IRD – based in the western Canadian city of Saskatoon – won a deal with the US state of Georgia for the supply and installation of 19 mainline WIM systems worth newly $8 million.

The deal includes mainline WIM scales on the interstate, at the roadside and in scale houses as well as license plate reading, USDOT number reading, side view cameras and overheight detection systems at 19 weigh station locations.

IRD’s systems will complement the automated ramp weigh station facilities previously provided by IRD and operated by the Georgia Department of Transport.

Information from the new systems will be sent to the 3328 Georgia Department of Transportation Traffic Management Centre, Georgia Department of Public Safety/ Motor Carrier Compliance and other state organisations.

Construction will start this year at truck weigh stations in Carroll County (I-20 westbound), Troup County (I-85 northbound and southbound), Douglas County (I-20 eastbound) and Catoosa County (I-75 northbound and southbound). Construction of the remaining weigh station sites is expected to be completed by the end of 2016.

IRD will also provide maintenance for five years.

Related Content

  • Indiana transport commissioner supports Ohio's turnpike leasing study
    November 8, 2012
    The US state of Indiana’s toll road lease supplied money for vital transport projects and Ohio is wise for studying its own turnpike lease agreement, Indiana’s Department of Transportation commissioner Michael Cline told hundreds of key Ohio transport industry figures. Cline was the keynote speaker for this year’s Ohio Transportation Engineering Conference in Columbus on Tuesday 30 October, 2012. During his address, he touted the benefits of the US$3.8 billion lease of the Indiana Toll Road in 2006.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Installation underway of first UK M4/M5 ‘superspan’ gantries
    July 4, 2012
    The installation is underway of the first superspan gantries on the M4/M5 managed motorway scheme. The existing gantries and infrastructure were successfully removed last month while the new steel gantries were being constructed, fitted-out and tested at a dedicated facility located near junction 17 of the M5, before being delivered to the works site. A total of 33 new overhead gantries, a number of which span 50m and weigh over 30tonnes, will be installed along the new managed motorway section up until T
  • Flashy WiM from HHB Batsch Dynaweigh
    November 29, 2022
    Total mass, axle load, vehicle type and license plate number are forwarded with a photo of the vehicle automatically in real time by means of the Weight Flasher.