Skip to main content

Insufficient traffic means Norwegian bridge to raise prices?

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available. According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The r
August 11, 2014 Read time: 1 min

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available.  According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The road toll company managing the bridge, Hardangerbrua, expects the toll revenue to be some 20% below target. If this trend continues the tolls may have to be raised. The Hardanger Bridge opened in August 2013. The structure was previously the subject of a key project report in World Highways:

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2429 0 oLinkExternal Norway's bridge meets tough environmental targets Visit: http://www.worldhighways.com/sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false /sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false false%>

Related Content

  • Canada: dump truck slams into bridge, partially demolishing it
    February 12, 2015
    In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • IRF Examiner launched as industry resource to boost efficiency
    May 19, 2014
    Volume 1 highlights life-saving role of new methods and proven technologies around the world Since the IRF’s establishment in 1948, knowledge transfer has been the core of what the IRF does best. As industry tools and procedures evolve to meet societies’ needs, the availability of global knowledge resources is now more important than ever.