Skip to main content

Insufficient traffic means Norwegian bridge to raise prices?

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available. According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The r
August 11, 2014 Read time: 1 min

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available.  According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The road toll company managing the bridge, Hardangerbrua, expects the toll revenue to be some 20% below target. If this trend continues the tolls may have to be raised. The Hardanger Bridge opened in August 2013. The structure was previously the subject of a key project report in World Highways:

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2429 0 oLinkExternal Norway's bridge meets tough environmental targets Visit: http://www.worldhighways.com/sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false /sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false false%>

Related Content

  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    January 6, 2017
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    April 19, 2013
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Bell will push the boundaries in ADT design
    February 6, 2013
    Bell Equipment is working on its biggest ever truck, which will offer a capacity of 55tonnes. A launch date has not yet been revealed for the hauler and technical details have yet to be revealed, however the machine will have a 4x4 drive system. Marc Schürmann managing director of Bell Equipment Europe said prototype testing for the machine will commence later this year. He said “Our competitors will be the smaller class of rigid haulers,” and he added that the aim is to offer lower fuel consumption and cap