Skip to main content

Insufficient traffic means Norwegian bridge to raise prices?

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available. According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The r
August 11, 2014 Read time: 1 min

Norway’s new Hardanger Bridge is not carrying enough traffic according to the latest data available.  According to the statistics for July 2014, some 3,500 vehicles/day crossed over the Hardanger Bridge (Hardangerbrua) in Norway. This was a notable increase from the 2,450 vehicles/day using the link in June 2014. This is higher than the normal volumes due to high levels of summer vacation traffic. However, it is not sufficiently high to hit the planned average of 1,950 vehicles/day for the whole year. The road toll company managing the bridge, Hardangerbrua, expects the toll revenue to be some 20% below target. If this trend continues the tolls may have to be raised. The Hardanger Bridge opened in August 2013. The structure was previously the subject of a key project report in World Highways:

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2429 0 oLinkExternal Norway's bridge meets tough environmental targets Visit: http://www.worldhighways.com/sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false /sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ false false%>

Related Content

  • A free bridge? You’ve got to be kidding.
    February 18, 2015
    Nothing will stop construction of another bridge crossing the Detroit River to ease traffic congestion around North America’s most important economic border. The New International Trade Crossing will be entirely financed and owned by the Canadian government under a public private partnership. It will link the US city of Detroit, in the state of Michigan, with the Canadian city of Windsor in the province of Ontario. The two cities already have the toll road Ambassador Bridge as well as a toll road tunnel and
  • Faresin shows upgraded telehandlers
    January 6, 2017
    Faresin Industries has expanded its telescopic handler range with the addition of the FH8.40 and the rotating Storm 22.45 evo. The FH8.40 sits in the range between the established FH7.45 and the FH9.30. The machine has a capacity of 4tonnes with a maximum lift height of 8m. Higher up the lifting scale, the Storm 22.45 rotating handler can manage up to 45tonne lifts, with a maximum height of 22m.
  • Faresin shows upgraded telehandlers
    April 19, 2013
    Faresin Industries has expanded its telescopic handler range with the addition of the FH8.40 and the rotating Storm 22.45 evo. The FH8.40 sits in the range between the established FH7.45 and the FH9.30. The machine has a capacity of 4tonnes with a maximum lift height of 8m. Higher up the lifting scale, the Storm 22.45 rotating handler can manage up to 45tonne lifts, with a maximum height of 22m.
  • Kubota announces new Chinese diesel engine factory in Wuxi City
    January 6, 2017
    Japanese engine manufacturer Kubota will use Bauma to announce its plan to build another engine plant in Wuxi City, China for the production of vertical-shaft diesel engines. This facility has 18,000 m2 of manufacturing space and will be a fully-owned subsidiary of Kubota China Holdings Co. Production levels will reach 97,000 engines a year and operations start in 2014. Once opened, Kubota will have 6 manufacturing plants around the world for diesel engines.