Skip to main content

Innovia to evaluate the Mission Zero Corridor project in Georgia

Innovia Technology, a UK research consultancy, has been chosen to evaluate an environmentally friendly road project in the US state of Georgia. Innovia, based in the city of Cambridge, will evaluate technologies and systems that the Mission Zero Corridor project has identified as useful for creating social, environmental and economic value from new roads. These include algae biodiesel gas stations, smart solar-powered roads, moon-cycle adjusting lights, wildlife bridges, driverless cars and electric-car ch
August 7, 2015 Read time: 2 mins
Innovia Technology, a UK research consultancy, has been chosen to evaluate an environmentally friendly road project in the US state of Georgia.

Innovia, based in the city of Cambridge, will evaluate technologies and systems that the Mission Zero Corridor project has identified as useful for creating social, environmental and economic value from new roads. These include algae biodiesel gas stations, smart solar-powered roads, moon-cycle adjusting lights, wildlife bridges, driverless cars and electric-car charging lanes.

Innovia’s role is also to evaluate the technologies for scalability and suggest ways of attracting stakeholders to invest time and money in projects.

“Worldwide the highway infrastructure is continuously maintained, rebuilt and expanded at considerable economic and environmental cost,” said Alastair MacGregor, chief executive of Innovia. “The Mission Zero Corridor Project is proposing an alternative future where highways have a positive impact on our communities.”

The Mission Zero Corridor project is part of a larger is a project called Blueprints for Successful Communities programme, undertaken by the Georgia Conservancy, a state-wide, membership environmental organisation that advocates for land conservation, coastal protection and sustainable growth.

Blueprints study focuses on the 25km Ray C. Anderson Memorial Highway, part of the Interstate 85 highway – called Mission Zero Corridors - in western Georgia.

Blueprints is run in partnership with faculty and graduate students in the School of Architecture at the Georgia Institute of Technology and a studio instruction team from 299 Perkins+Will, Architects, in Atlanta. Their work is to examine ways to transform highway corridors into roadways that have far less degrading environmental impacts.

More information about Mission Zero Corridor Project is %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal available here Visit MZC executive summary page false http://www.raycandersonfoundation.org/assets/pdfs/MZC_executive_summary.pdf false false%>.

For more information on companies in this article

Related Content

  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • A future UK government should focus more on potholes and road safety
    April 10, 2015
    With a national UK election looming next month, a future government must make road safety a top priority, said the Institute of Advanced Motorists (IAM). Half of motorists in a recent survey of 2,156 people, and conducted IAM in March, said the current administration has not given the issue as much attention as is needed. The number one issue that the government should be focussing on, according to 70% of respondents, is the reduction of the number of potholes. The backlog of repairs now tops more
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September