Skip to main content

Indonesia’s Trans Marga Jateng secures key new toll road loan

A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
April 8, 2014 Read time: 1 min
A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia.

1075 Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator 1083 Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank 1077 Mandiri.

The new toll road will run from Solo to Semarang through Salatiga and Boyolali, part of the Trans Java toll road project between Merak (Banten) and Banyuwangi (East Java).

Of the total loan, $158.87 million (IDR 1.8 trillion) will come from Bank Mandiri, whereas the remaining $8.82 million (IDR 100 billion), $97.08 million (IDR 1.1tn), and $141.21 million (IDR 1.6 trillion) will be contributed by Regional Development Bank of Central Java (Bank 1080 Jateng), Bank 1081 Rakyat Indonesia (BRI), and 1079 Bank Negara Indonesia (BNI) respectively.

For more information on companies in this article

Related Content

  • Widening and upgrade for highway in Nicaragua’s capital
    January 27, 2017
    Nicaragua is continuing to develop its highway network, this time with a major project planned for the capital, Managua. A loan worth close to US$107.5 million from the Central American Bank for Economic Integration (CABEI) is to help pay for the project. The work calls for the upgrade and widening of the Pista Juan Pablo II route running through Managua. The 9.55km stretch of road will benefit from three additional lanes, helping to boost capacity and reduce congestion and delays at peak periods. Safety pr
  • New Indonesia toll road construction commencing
    December 17, 2018
    Construction work on a new toll road connection is due to commence in Indonesia in mid-2019. The 120km road connecting Solo, Yogyakarta and Kulonprogo will be built by the Adhi Karya (ADHI) consortium. The project is costing an estimated US$1.25 billion and should take 36 months to complete. One of the most complex sections of the project will be for the 20km stretch of elevated highway. The new toll road will also provide a connection to the new Yogyakarta International Airport.
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • Russia’s new high speed highway – with Italian investment
    January 30, 2020
    Italian investment will help to build a major high-speed highway in Russia