Skip to main content

Indonesia’s Trans Marga Jateng secures key new toll road loan

A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
April 8, 2014 Read time: 1 min
A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia.

1075 Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator 1083 Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank 1077 Mandiri.

The new toll road will run from Solo to Semarang through Salatiga and Boyolali, part of the Trans Java toll road project between Merak (Banten) and Banyuwangi (East Java).

Of the total loan, $158.87 million (IDR 1.8 trillion) will come from Bank Mandiri, whereas the remaining $8.82 million (IDR 100 billion), $97.08 million (IDR 1.1tn), and $141.21 million (IDR 1.6 trillion) will be contributed by Regional Development Bank of Central Java (Bank 1080 Jateng), Bank 1081 Rakyat Indonesia (BRI), and 1079 Bank Negara Indonesia (BNI) respectively.

For more information on companies in this article

Related Content

  • Mega project for Indonesia
    March 22, 2012
    The Indonesian Government has handed out contracts for the new Sunda Strait Bridge. Construction of the US$11 billion project is expected to commence in the first quarter of 2014.
  • Key Russian road construction complete
    December 5, 2016
    Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Mega project for Indonesia
    July 2, 2012
    The Indonesian Government has handed out contracts for the new Sunda Strait Bridge. Construction of the US$11 billion project is expected to commence in the first quarter of 2014. The preliminary work now starting includes a feasibility study and the first stages of the design process, with specialist consultants having been contracted for this work. The bridge will measure some 29km long and will connect Lampung in Sumatra and Merak in Java, crossing the Sunda Strait as its name suggests. The structure wil