Skip to main content

Indonesia’s Trans Marga Jateng secures key new toll road loan

A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
April 8, 2014 Read time: 1 min
A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia.

1075 Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator 1083 Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank 1077 Mandiri.

The new toll road will run from Solo to Semarang through Salatiga and Boyolali, part of the Trans Java toll road project between Merak (Banten) and Banyuwangi (East Java).

Of the total loan, $158.87 million (IDR 1.8 trillion) will come from Bank Mandiri, whereas the remaining $8.82 million (IDR 100 billion), $97.08 million (IDR 1.1tn), and $141.21 million (IDR 1.6 trillion) will be contributed by Regional Development Bank of Central Java (Bank 1080 Jateng), Bank 1081 Rakyat Indonesia (BRI), and 1079 Bank Negara Indonesia (BNI) respectively.

For more information on companies in this article

Related Content

  • Indonesia toll road completed on schedule
    May 16, 2016
    The construction of the Cipali Toll Road in Indonesia has been completed on time, despite numerous challenges during its construction. The Cipali Toll Road forms part of a larger network, the Trans-Java Toll Road that connects key freeways in Jakarta and beyond. The Trans-Java Toll Road is of enormous importance to Indonesia as it runs for 653km and reduces the existing route by 40km.
  • Trans-Sumatra Highway toll road project
    June 8, 2020
    The Trans-Sumatra Highway toll road project is being prioritised.
  • Indonesia’s new toll road link
    March 25, 2019
    Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
  • New port, bridge and toll road links for Indonesia
    January 20, 2015
    In Indonesia investment in infrastructure will see the construction of a new bridge and toll roads in Banten Province during 2015. The work is intended to help with the development of the Merak Port, according to the Ministry of Public Works and Housing. The plan includes construction of a 3km toll road and a 600m bridge to connect to the port. Another project planned is for an 84km toll road. The Panimbang-Serang road will become part of the 5,000km nationwide toll road network and will provide a link to t