Skip to main content

Indonesia’s Trans Marga Jateng secures key new toll road loan

A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
April 8, 2014 Read time: 1 min
A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia.

1075 Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator 1083 Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank 1077 Mandiri.

The new toll road will run from Solo to Semarang through Salatiga and Boyolali, part of the Trans Java toll road project between Merak (Banten) and Banyuwangi (East Java).

Of the total loan, $158.87 million (IDR 1.8 trillion) will come from Bank Mandiri, whereas the remaining $8.82 million (IDR 100 billion), $97.08 million (IDR 1.1tn), and $141.21 million (IDR 1.6 trillion) will be contributed by Regional Development Bank of Central Java (Bank 1080 Jateng), Bank 1081 Rakyat Indonesia (BRI), and 1079 Bank Negara Indonesia (BNI) respectively.

For more information on companies in this article

Related Content

  • Indonesia's infrastructure investment
    February 17, 2012
    Indonesia is planning significant investment in its highway network as part of a programme of infrastructure improvements.
  • Trans-Sumatra highway deal for Indonesia
    July 25, 2016
    Funding sources are being looked at for the important Trans-Sumatra highway in Indonesia. The Indonesian Government has been holding discussions with the Asia Investment Infrastructure Bank (AIIB). A loan for the construction of the 130km stretch of tolled highway from Pekanbaru to Dumai is being considered. In all this stretch of highway is expected to cost some US$1.24 billion to construct with just under a third being funded by the loan.
  • New toll road link for Indonesia
    June 24, 2016
    Work is progressing on an important toll road project in Indonesia that will link Bogor, Sukabumi and Ciawi in West Java. The construction work is being carried out by Trans Jabar Tol, a subsidiary of state-owned firm Waskita Karya. The project is costing some US$577.6 million and will reduce travel time from Sukabumi to Indonesia’s capital Jakarta to one hour, compared with the four hours the journey can take at present. The project was intended to be complete by 2018 but could now take until 2019 to finis
  • Indonesia's new tolled link
    April 26, 2012
    Work on Indonesia's new 116km Palimanan-Cikampek highway is now commencing. The work is being managed by Malaysian firm PLUS Expressways (PLUS) and is the company's first Indonesian highway projects.