Skip to main content

Hungary's new highways

Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway.
March 1, 2012 Read time: 1 min
Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway. The 12km construction project will be completed by the end of 2012. Meanwhile, construction design work for the 28km section of the M49 highway between Okoritofulpos and Or will be completed by the end of 2011. The new M49 section is expected to open by 2014. The project includes the construction of three rail overpasses, four canal overpasses and five junctions. Plans are also being made for a 33km long stretch of the M3 highway between Or and Nyiregyhaza. This last project will cost €120.5 million and should be completed by the end of 2012.

Related Content

  • Alberta to twin last 215km of Highway 3
    December 6, 2022
    Request for proposals are going ahead for twinning several more sections of Highway 3, a major commercial and trucking route that runs across the western Canadian province.
  • Hungary motorway project awarded
    June 7, 2016
    Work is now starting on a new stretch of motorway in Hungary. The project was awarded to the Colas Hungaria-Colas Ut consortium and is worth some €54.74 million. The work involves building a new section of the M35 motorway connecting road number 481 with road number 4 and the contract was awarded by the Hungarian national infrastructure development firm, NIF. Local contractor STR Epito will build a new road connecting road number 47 with the M35, with work starting in July 2016 and due for completion in
  • €652 million of Romanian highway deals
    March 28, 2024
    €652 million of Romanian highway deals are being awarded.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete