Skip to main content

Hungary's new highways

Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway.
March 1, 2012 Read time: 1 min
Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway. The 12km construction project will be completed by the end of 2012. Meanwhile, construction design work for the 28km section of the M49 highway between Okoritofulpos and Or will be completed by the end of 2011. The new M49 section is expected to open by 2014. The project includes the construction of three rail overpasses, four canal overpasses and five junctions. Plans are also being made for a 33km long stretch of the M3 highway between Or and Nyiregyhaza. This last project will cost €120.5 million and should be completed by the end of 2012.

Related Content

  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.
  • New Moscow’s massive motorway building and road maintenance programme
    February 5, 2015
    A huge programme of works is planned for New Moscow. This is aimed at adding extra capacity. The plan calls for the building or reconstruction of over 120km of roads within the next four years. About 600km of roads will be built in the Troitsky and Novomoskovsky (New Moscow) administrative districts by 2035. Most of the new roads will be built with four lanes, allowing two in either direction. The Central Ring Road is a priority project. A road between the Kommunarka village and the Yuzhnoe Butovo district
  • Key Polish projects are underway or compelte
    December 4, 2014
    The Polish town of Marki is to benefit from a new 15km ring road, which will be constructed by a consortium comprising the contractors Astaldi and Salini. The project has a total value of some €167.4 million. The first section will measure 8.1km and run from Kobylka and Marki junctions. Salini plans to complete this stretch in 32 months. Meanwhile, the second section will run between Radzymin Pld and Kobylka junctions and will be completed in 36 months. Meanwhile work on the final section of the S8 road has
  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge