Skip to main content

Hungary's new highways

Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway.
March 1, 2012 Read time: 1 min
Work will start in the second half of 2011 on a new stretch of Hungary's M3 highway between Vasarosnameny and the number 49 highway. The 12km construction project will be completed by the end of 2012. Meanwhile, construction design work for the 28km section of the M49 highway between Okoritofulpos and Or will be completed by the end of 2011. The new M49 section is expected to open by 2014. The project includes the construction of three rail overpasses, four canal overpasses and five junctions. Plans are also being made for a 33km long stretch of the M3 highway between Or and Nyiregyhaza. This last project will cost €120.5 million and should be completed by the end of 2012.

Related Content

  • Netherlands reviews tunnel safety
    May 15, 2012
    Questions are being asked in the Netherlands following the news that twin road tunnels planned to form part of the new 7km stretch of the A4 highway between Delft and Schiedam will not meet EU safety regulations. The Dutch Commission for Tunnel Safety says that the link, which has a total of eight lanes, will not meet the EU regulations, which were toughened after a series of tunnel disasters in Austria and Switzerland. Instead the commission wants four tunnels to be built, each for two lanes of traffic,
  • Mixed US transportation outlook for 2012 according to ARTBA
    April 26, 2012
    The outlook for the 2012 transportation construction market is mixed, according to the American Road & Transportation Builders Association's (ARTBA). The 2012 Transportation Construction Market forecast from ARTBA shows that the industry will face uncertain times during next year.
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t
  • 2015 IRF Global Road Achievement Awards Laureate
    September 15, 2015
    Commuter traffic in the Taipei Metropolitan Area is a major concern for the city’s town planners. In 2009, a decision was reached to widen National Freeway No. 1 between Wugu and Yangmei on a 42km section of freeway on the northern part of town. The lane-widening project saw the construction of two new viaducts built along each side of the freeway. From the onset, the project presented tremendous challenges owing to various factors, including limited space for construction; passing through a geologically