Skip to main content

Highways England to trial different speeds through road works

Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback. Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks. Speed through motorway roadworks could be increased depending on what day of the week they are travelling. The decision follows earlier trials to increase the speed l
August 6, 2018 Read time: 3 mins
Highways England is considering higher workzone speeds only if worker safety remains high
8100 Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback.


Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks.

Speed through motorway roadworks could be increased depending on what day of the week they are travelling.

The decision follows earlier trials to increase the speed limit through roadworks from 80kph to more than 95kph.

“The speed could be increased to [95kph] on a Sunday if there is less activity taking place and then brought back down to [80kph] when road workers are working within a few feet of passing traffic,” Highways England said in a written statement.

It is also exploring if different speed limits could operate within one set of roadworks. This could mean people commute to work on one carriageway at 80kph as they are nearer the workforce, but drive home on the other carriageway at 95kph as the road workers are further away.

Jim O’Sullivan, chief executive of Highways England, said the agency is aware of people’s concerns. “At the same time we have to ensure as they drive through them that they, and our road workers, are safe. So we are always thinking of new ways to improve journeys at the same time as keeping everyone as safe as we can. That is why over the next 12 months we will test changes to the design and operation of roadworks,” he said.

During roadworks narrow lanes are installed to provide a safe working area for the workforce. Highways England said that by doing this as many lanes as possible can remain open to traffic. Highways England operates an 80kph or lower limit in narrow lanes. But this year it will test whether it is safe to operate at 95kph in certain circumstances. This might include consideration of the width of the narrow lanes or the type of temporary safety barriers.

The trials are outlined in the company’s recently published Delivery Plan Update for 2018/19. The plan sets out how the company is delivering the government’s five-year €17 billion road investment programme that ends in 2020.

It also includes the goals of preventing 200 deaths or serious injuries by 2020 and more working overnight to reduce the impact on road users during the day. From March 2017 to February this year 85% of roadworks were completed overnight, a 5% increase from a year earlier.

For more information on companies in this article

Related Content

  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e
  • WheelRight’s John Catling says put the brakes on under-inflation
    September 30, 2016
    It’s official – Britain’s tyres are unloved and under-inflated, according to recent research. But WheelRight’s chief executive, John Catling, believes that the research results are indicative of a global problem.
  • Australia’s road safety problems are a cause for concern
    January 23, 2019
    The Australian Road Research Board (ARRB) has highlighted key problems with road safety. According to the ARRB, these issues must be addressed if Australia’s road casualty rate is to be reduced. Road death tolls are being reduced as he latest results show, but more work needs to be done. According to the ARRB, the road death tolls in Victoria dropped 20% for 2018 when compared with the previous year. This is a major improvement, showing the gains made by Victoria’s road agency VicRoads and the state’s Tr