Skip to main content

Highway upgrade for Quebec

Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million).
February 17, 2012 Read time: 1 min
Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million). The road is located in West Quebec and work is not expected to commence until 2013. 1521 Quebec's Ministry of Transport has explained that the Henry IV road will be widened as this will be more effective at reducing congestion as well as being cheaper than the alternative, which would have been to extend the Félix-Leclerc highway. This analysis of the comparative benefits of the Henry IV project came from a report by the engineering firm 2804 Genivar.

For more information on companies in this article

Related Content

  • Portuguese firm wins contracts in Angola and Brazil
    July 19, 2016
    A series of major road projects will be carried out by Portuguese contractor Mota Engil in Angola and Brazil. In all the work is worth in excess of US$419 million. The company is building a 10km section of the Via Expressa around capital Luanda, as well as upgrading another key route in the city. Luanda’s population has grown significantly in recent years and many existing roads are now proving unable to cope with demand.
  • Israel road tender opening
    October 25, 2019
    The tender process is opening in Israel for work to widen the Ayalon Highway in Tel Aviv. The project involves widening the route by adding a lane in either direction. Two new bridges will also be built as part of the project, which is expected to be worth some US$124 million. The first phase of the widening work to the Ayalon Highway is already underway, having commenced in July 2019 and construction of the second phase will start shortly. This new tender process is for the third phase of the highway widen
  • Recycling highway material reduces waste and costs
    March 15, 2012
    The use of specialist equipment to produce hydraulically bound mixtures can save 30-40% on the cost of landfill and backfill it is claimed. The transportation and removal of old material from certain highway projects has long been a problem for contractors. But David MacLynn believes that the answer, in many instances, could lie in the use of hydraulically bound mixtures (HBM), which he says can save between 30-40% on the cost of landfill and backfill.
  • Circular route proposed for Myanmar’s capital
    February 17, 2015
    Talks are in hand in Myanmar with regard to a new circular raised road route around capital Yangon. The aim of the project would be to cut congestion by constructing a new elevated road network. The construction cost is expected to be around US$2.5 billion. Work looks likely to commence in the 2015-1016 period following feasibility studies and a tender process. The project is expected to have considerable input from the private sector and to be carried out under a build-operate-transfer model. A number of i