Skip to main content

Highway upgrade for Quebec

Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million).
February 17, 2012 Read time: 1 min
Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million). The road is located in West Quebec and work is not expected to commence until 2013. 1521 Quebec's Ministry of Transport has explained that the Henry IV road will be widened as this will be more effective at reducing congestion as well as being cheaper than the alternative, which would have been to extend the Félix-Leclerc highway. This analysis of the comparative benefits of the Henry IV project came from a report by the engineering firm 2804 Genivar.

For more information on companies in this article

Related Content

  • Hitachi upgrades European mini excavator facility
    July 19, 2018
    Hitachi Construction Machinery (Europe) NV (HCME) has upgraded its European mini excavator factory to boost manufacturing efficiency. The firm has officially opened its mini and compact excavator factory at Oosterhout, in the Netherlands. The new 8,000m2 facility is the result of an extensive modernisation programme, which commenced in January 2018. The firm says that the upgrade will increase efficiency at the factory that is responsible for producing the ZX10 to ZX85 models. It will also meet the growing
  • Philips CityTouch brings street lighting into focus
    December 20, 2016
    As far as 99% of any city’s population is concerned, street lights are just, well, there. But big changes are taking place, as explained by lighting systems provider Philips Lighting. Street lighting has been with us for more than a century. With the exception of the early 20th century switchover from gas to electricity and the recent most important invention of LEDs, there have been few obvious changes.
  • LeeBoy’s strong future, through Tier 4 Final investment
    February 22, 2019
    LeeBoy is seeing strong sales for its road machines at the moment, particularly in the US. And the firm’s early investment in fitting Tier 4 Final compliant engines has played a significant role Christopher Barnard is CEO of LeeBoy and commented, “The US has been strong. Demand is there and the infrastructure spending is there. It’s a good market. In our segment for commercial paving we’re doing very well.” The paver range is selling well and the firm’s 8520 model is a particularly strong seller. Barnard
  • LeeBoy’s strong future, through Tier 4 Final investment
    March 20, 2019
    LeeBoy is seeing strong sales for its road machines at the moment, particularly in the US. And the firm’s early investment in fitting Tier 4 Final compliant engines has played a significant role Christopher Barnard is CEO of LeeBoy and commented, “The US has been strong. Demand is there and the infrastructure spending is there. It’s a good market. In our segment for commercial paving we’re doing very well.” The paver range is selling well and the firm’s 8520 model is a particularly strong seller. Barnard