Skip to main content

Highway upgrade for Quebec

Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million).
February 17, 2012 Read time: 1 min
Canada's Henri IV road will be widened and upgraded in a project worth US$413.6 million ($400 million). The road is located in West Quebec and work is not expected to commence until 2013. 1521 Quebec's Ministry of Transport has explained that the Henry IV road will be widened as this will be more effective at reducing congestion as well as being cheaper than the alternative, which would have been to extend the Félix-Leclerc highway. This analysis of the comparative benefits of the Henry IV project came from a report by the engineering firm 2804 Genivar.

For more information on companies in this article

Related Content

  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
  • Strong performance sees Wirtgen Group bullish
    September 30, 2014
    The Wirtgen Group reports that strong financial performance is expected for 2014. Full results are not yet available for 2014 but the privately held, family owned firm is confident for good results. Joint president Jürgen Wirtgen said, “Sales for 2014 will reach €1.95 billion.” He explained that for the first half of 2013, turnover reached €285 million, whereas for the first six months of 2014, turnover reached €329 million, a jump of 15%. The second half of the year is also looking healthy with the firm on
  • The payload answer for ADT haulage?
    July 8, 2016
    Will increased ADT load capacity provide a suitable solution to increasing aggregate and earthmoving haulage needs? Mike Woof reports The rule of thumb with off-highway machinery is that for bulk operations, larger equipment can deliver economies of scale, with bigger payloads allowing a better cost/tonne. Heavier machines may be less versatile than more compact units, so a type of equipment that retains its versatility as it is scaled up in size can offer major benefits. For the articulated dumptruc
  • A series of major highway upgrades is open for tender in Scotland
    April 4, 2012
    The Scottish Government has announced that a project to complete the M8 and to upgrade several other highways is going to cost about €606 million (£508 million). In all some 18km of highway will be upgraded, although the project will not be completed until 2017, four years later than was originally planned. The delays are blamed on funding issues. The work is being handled by the Transport Scotland agency, which has opened the tender process