Skip to main content

HDR wins I-710 Corridor study

The Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of HDR to perform the I-710 Corridor Project North Utility study.
March 14, 2012 Read time: 1 min
RSSThe 3227 Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of 2418 HDR to perform the I-710 Corridor Project North Utility study. The Long Beach Freeway (I-710), a vital transportation artery, links the ports of Long Beach and Los Angeles to major Southern California distribution centres and intermodal rail facilities. An essential component of the regional, statewide and national transportation system, it serves both passenger and goods movement vehicles.

In response to the need to improve traffic and safety conditions caused by population growth, increased cargo container volume at the ports of Los Angeles and Long Beach, increasing traffic volumes and an aging infrastructure, Metro and its project partners are preparing to make improvements to the I-710 corridor between SR 60 and the ports.

HDR will provide comprehensive utility relocation strategy and advance planning studies for the segment of the I-710 corridor that stretches from north of the Los Angeles River to the SR 60 freeway. The company’s work includes complex geometric design for a six-mile segment of the planned freight corridor, analysis of river hydraulics and relocation strategies for high-voltage electrical transmission lines in the highly constrained Los Angeles River corridor.

For more information on companies in this article

Related Content

  • Replace bridge for Vancouver’s Massey Tunnel could aid congestion
    December 21, 2015
    Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population. The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.
  • Key Los Angeles interchange upgrade
    March 25, 2024
    US$130 million Los Angeles interchange upgrade commencing.
  • Telvent to implement its SmartMobility Road Suite in Saudi Arabia.
    May 14, 2012
    Telvent GIT has been awarded a contract by Almabani General Contractors to implement the Telvent SmartMobility Road Suite solution on the extension of the roads in Arriyadh Old Airport area. The project, lead by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11 kms and the construction of three tunnels.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk