Skip to main content

HDR wins I-710 Corridor study

The Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of HDR to perform the I-710 Corridor Project North Utility study.
March 14, 2012 Read time: 1 min
RSSThe 3227 Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of 2418 HDR to perform the I-710 Corridor Project North Utility study. The Long Beach Freeway (I-710), a vital transportation artery, links the ports of Long Beach and Los Angeles to major Southern California distribution centres and intermodal rail facilities. An essential component of the regional, statewide and national transportation system, it serves both passenger and goods movement vehicles.

In response to the need to improve traffic and safety conditions caused by population growth, increased cargo container volume at the ports of Los Angeles and Long Beach, increasing traffic volumes and an aging infrastructure, Metro and its project partners are preparing to make improvements to the I-710 corridor between SR 60 and the ports.

HDR will provide comprehensive utility relocation strategy and advance planning studies for the segment of the I-710 corridor that stretches from north of the Los Angeles River to the SR 60 freeway. The company’s work includes complex geometric design for a six-mile segment of the planned freight corridor, analysis of river hydraulics and relocation strategies for high-voltage electrical transmission lines in the highly constrained Los Angeles River corridor.

For more information on companies in this article

Related Content

  • Innovative moveable barrier system
    March 9, 2012
    New ownership offers greater overseas potential for Barrier Systems
  • Roadmarking requirements can boost highway safety for road users
    April 11, 2013
    Road markings are an essential component of a modern infrastructure and an essential contributor to driver comfort and road safety. The COST 331 study, which ran from 1996 to 1999, mainly focused on dry night conditions and indicated that the increased luminance of road markings, results in a better delineation of the road and offers more reaction time for drivers. On average a slight increase in speed was noted, but the increased visibility was mainly converted into more reaction time. IMPROVER, which ran
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Total Styrelf tests start in England
    April 15, 2021
    Resurfacing has started with Total Styrelf eXtreme 100 and Total Styrelf Long Life binders.