Skip to main content

HDR wins I-710 Corridor study

The Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of HDR to perform the I-710 Corridor Project North Utility study.
March 14, 2012 Read time: 1 min
RSSThe 3227 Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of 2418 HDR to perform the I-710 Corridor Project North Utility study. The Long Beach Freeway (I-710), a vital transportation artery, links the ports of Long Beach and Los Angeles to major Southern California distribution centres and intermodal rail facilities. An essential component of the regional, statewide and national transportation system, it serves both passenger and goods movement vehicles.

In response to the need to improve traffic and safety conditions caused by population growth, increased cargo container volume at the ports of Los Angeles and Long Beach, increasing traffic volumes and an aging infrastructure, Metro and its project partners are preparing to make improvements to the I-710 corridor between SR 60 and the ports.

HDR will provide comprehensive utility relocation strategy and advance planning studies for the segment of the I-710 corridor that stretches from north of the Los Angeles River to the SR 60 freeway. The company’s work includes complex geometric design for a six-mile segment of the planned freight corridor, analysis of river hydraulics and relocation strategies for high-voltage electrical transmission lines in the highly constrained Los Angeles River corridor.

For more information on companies in this article

Related Content

  • Texas Interstate connection upgrade project
    January 31, 2018
    Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
  • Adaptive signal control report
    April 30, 2012
    A study of McCain’s QuicTrac adaptive control software, deployed over a year ago by the Californian city of Temecula, has highlighted the array of benefits achievable through an adaptive system. The survey calculated the arterials’ level of service, measured in delay per vehicle, both pre- and post-deployment, evaluating the systems’ benefit-to-cost ratio and environmental impact.
  • Texas boosts infra investment
    September 16, 2024
    The investment includes the adoption of a 10-year US$104.2 billion transportation plan by the Texas Department of Transportation.
  • US city of Vancouver approves new I-5 bridge
    July 18, 2022
    Vancouver in the US state of Washington and Portland in the state of Oregon are aiming for a new road bridge with the possibility of accommodating light rail transport.