Skip to main content

Hard shoulder running cuts travel time by 50% in Belgium

VAB, the association of Flemish drivers, has said that the new hard shoulder running scheme on the E313 motorway between Antwerp and Liege during rush hours has reduced travel time by 50 per cent.
May 2, 2012 Read time: 1 min
VAB, the association of Flemish drivers, has said that the new hard shoulder running scheme on the E313 motorway between Antwerp and Liege during rush hours has reduced travel time by 50 per cent. This represents a gain of between 20 minutes and 30 minutes for drivers. VAB has now called on Hilde Crevits, Flemish Minister for Mobility, to extend the use of hard shoulder running to other severely congested sections of motorway.

Related Content

  • IBM and EKZ exploring balanced EV charging
    April 26, 2012
    IBM Research has teamed with EKZ, the electricity utility provider of the Canton of Zurich in Switzerland, on a new pilot project that will allow consumers to conveniently charge electric vehicles and monitor their energy costs, using mobile devices. This near real-time information will also help utility providers better manage power grid loads during peak charging times, a challenge that is set to grow as more electric vehicles are on the road. The pilot is using onboard devices fitted in several vehicl
  • $10.1 billion South Australia road and tunnel project
    July 14, 2025
    Work is underway for a $10.1 billion South Australian road and tunnel project.
  • Brazil’s haulage firms face more costs due to strict new legislation
    September 17, 2012
    The Brazilian haulage sector is in the process of adjusting to a new bill set to come into force soon that will regulate compulsory driver resting periods. Law 12.619 means drivers must have a minimum resting period of 30 minutes for every four hours on the road. In addition, they must stop for one hour at lunch time, and they need to rest 11 hours for every 24 hours worked.
  • Morocco bypass tender process underway
    December 13, 2018
    The tender process is underway in Morocco for the North-East bypass for Agadir. The project is needed to reduce the chronic congestion that occurs on the existing routes around the city during peak periods at present. Traffic flow on the city’s outer ring road can become particularly sluggish during rush hour periods. The new bypass will help the flow of both commuter traffic and heavy vehicles between the port of Agadir to Agadir Al-Massira Airport, as well as for roads on the northern side of the city. It