Skip to main content

Haast-Hollyford, NZ toll road to provide 1,500 construction jobs

The US$197.79 million (NZD 230 million) Haast-Hollyford toll road in New Zealand is expected to provide 1,500 construction jobs over four years, increase West Coast tourism and cut travel time between Haast and Milford Sound. Extra funding for the toll road has been made available. The toll fee will begin at $30.26 (NZD 35) per traveller and will generate $25.93 million (NZD 30 million) in the first year.
March 31, 2014 Read time: 1 min
The US$197.79 million (NZD 230 million) Haast-Hollyford toll road in New Zealand is expected to provide 1,500 construction jobs over four years, increase West Coast tourism and cut travel time between Haast and Milford Sound. Extra funding for the toll road has been made available. The toll fee will begin at $30.26 (NZD 35) per traveller and will generate $25.93 million (NZD 30 million) in the first year.

Related Content

  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
  • Two German autobahns benefit from new Wirtgen concrete slipforming technology
    November 15, 2013
    Two important routes in Germany, the A9 and A6 autobahn highways, have benefited from the use of the latest Wirtgen slipforming machines. The A9 is a particularly important route in Germany as this 529km link connects capital Berlin with the southern city of Munich, running through Brandenburg, Saxony-Anhalt, Saxony, Thuringia and Bavaria.
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."
  • Concrete plants: flexibility and efficiency
    March 17, 2016
    Concrete mixing plants are becoming more flexible and innovative to ensure they meet increasingly stringent construction schedules. Increasing demands are put on contractors to cut down the transportation of material to construction sites in the name of efficiency and the environment. For that reason concrete mixing plants are increasingly flexible in their transportation to sites, their set up times and their output. Ammann Elba, the company created when German-based Elba was acquired by Ammann in 20