Skip to main content

Haast-Hollyford, NZ toll road to provide 1,500 construction jobs

The US$197.79 million (NZD 230 million) Haast-Hollyford toll road in New Zealand is expected to provide 1,500 construction jobs over four years, increase West Coast tourism and cut travel time between Haast and Milford Sound. Extra funding for the toll road has been made available. The toll fee will begin at $30.26 (NZD 35) per traveller and will generate $25.93 million (NZD 30 million) in the first year.
March 31, 2014 Read time: 1 min
The US$197.79 million (NZD 230 million) Haast-Hollyford toll road in New Zealand is expected to provide 1,500 construction jobs over four years, increase West Coast tourism and cut travel time between Haast and Milford Sound. Extra funding for the toll road has been made available. The toll fee will begin at $30.26 (NZD 35) per traveller and will generate $25.93 million (NZD 30 million) in the first year.

Related Content

  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
  • New UK dual carriageway project commencing
    February 14, 2020
    Work for an important dual carriageway connection in the UK is now moving ahead.
  • Finnish Motorway Finally finished: Finland's M1
    July 23, 2012
    It has taken a long time to complete, but a vital motorway link is open to traffic as Heikki Harri reports After almost 50 years of construction, the M1 motorway linking Helsinki, the Finnish capital city and Turku, the country's old capital in the southwest, is finally completed. It did not take all 50 years of construction but the first section from Helsinki towards the west was constructed in the mid -1960s. Then there was a pause until mid-1990s when the works resumed section by section. The final sect
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.