Skip to main content

Greater Manchester's smart motorway M60 now fully-operational

Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to Highways England. The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras. The removal of narrow lanes and completion of the project will allow key sections of the M60
August 6, 2018 Read time: 2 mins
Manchester’s smart motorway M60 goes live
Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to 8100 Highways England.

 
The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras.

The removal of narrow lanes and completion of the project will allow key sections of the M60 to be resurfaced starting this month with a programme of overnight resurfacing and bridge maintenance.

“Although this is the first smart motorway in the north west the system has been running successfully in other parts of the country for several years, such as around Leeds,” said Jonathan Stokes, senior project manager at Highways England, the UK government’s agency responsible for constructing and running major highways.

The M60 smart motorway project is part of Highways England’s €112 million investment in maintenance work across the north west England. Resurfacing will reduce the need for further maintenance, meaning less disruption in the long run. All work is taking place at night to minimise disruption to drivers.

For more information on companies in this article

Related Content

  • Smart UK motorway scheme
    February 19, 2014
    The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth t
  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • UK’s busy M6 motorway widening
    October 16, 2024
    The UK’s busy M6 motorway is benefiting from widening work.
  • Uretek delivers voided soils treatment for UK’s M3 Smart Motorway
    February 8, 2018
    Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.