Skip to main content

Greater Manchester's smart motorway M60 now fully-operational

Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to Highways England. The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras. The removal of narrow lanes and completion of the project will allow key sections of the M60
August 6, 2018 Read time: 2 mins
Manchester’s smart motorway M60 goes live
Drivers using the M60 in the greater Manchester area now using the region’s first smart motorway, according to 8100 Highways England.

 
The technology, which went line on July 31 on the final M60 section, includes electronic signs to guide drivers along at a variable but steady speed. Other technology includes an extra running lane in each direction along the M62 between junction 18 and junction 20 and CCTV cameras.

The removal of narrow lanes and completion of the project will allow key sections of the M60 to be resurfaced starting this month with a programme of overnight resurfacing and bridge maintenance.

“Although this is the first smart motorway in the north west the system has been running successfully in other parts of the country for several years, such as around Leeds,” said Jonathan Stokes, senior project manager at Highways England, the UK government’s agency responsible for constructing and running major highways.

The M60 smart motorway project is part of Highways England’s €112 million investment in maintenance work across the north west England. Resurfacing will reduce the need for further maintenance, meaning less disruption in the long run. All work is taking place at night to minimise disruption to drivers.

For more information on companies in this article

Related Content

  • Stafford road project underway
    July 8, 2025
    Work is underway in the UK for a key Stafford road project.
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de
  • Electric road for Aylesbury in the UK
    November 25, 2019
    Researchers from the UK’s Lancaster University will design, fabricate and test systems that generate electricity using piezoelectricity and hydromechanical dynamics from passing vehicles. The electricity produced will be stored in roadside batteries to power street lamps, road signs and air pollution monitors in the town of Aylesbury. There will also be sensors that detect the formation of potholes, according to a statement from the university’s engineering department. In addition, the so-called smart
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in