Skip to main content

Genoa’s San Giorgio Bridge set to open

Contractor Webuild has been completing work, including solar panel installation.
By David Arminas July 31, 2020 Read time: 1 min
Trucks drive across the San Giorgio Bridge in Italy as part of load testing before the structure opens (photo courtesy Webuild)

The San Giorgio Bridge - the Morandi Bridge replacement in Genoa, Italy - will open on Monday following several weeks of load tests.

The tests started earlier this month following the recent near completion of the structure in a record 13 months by contractors Webuild and Fincantieri. The series of tests, conducted by state motorways entity Anas and Rina initially consisted of 16 heavy trucks driving along the bridge during what is called phase zero of a preliminary assessment.

Later, another 56 trucks lorries weighing 44 tonnes each - a combined weight of 2,500 tonnes - put the bridge through further tests.

Static load tests continued in the coming days trucks continued to run along the bridge. The eastern ramp, however, had remote-controlled vehicles on it in the early parts of the tests.

Meanwhile, Webuild has been completing its work preparing the bridge for delivery, installing glass and solar panels, setting up signage and preparing the final layer of asphalt 4cm thick.

The new bridge was designed by Renzo Piano.

The old Morandi Bridge was named after its structural designer but officially called Viadotto Polcevera, or Polcevera Viaduct in English. It was constructed between 1963 and 1967 along Italy's A10 motorway over the River Polcevera.  It collapsed during a severe storm in 2018, which involved multiple fatalities.

Related Content

  • Bitumen technology: cutting maintenance costs
    April 8, 2022
    Thicklift in Utah, epoxy modification for Ethiopia and inbuilt de-icing in South Korea - a focus on technologies designed to lower maintenance and rehabilitation costs over the life of a pavement
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.