Skip to main content

FSTech awarded TxDoT back office operations contract

Federal Signal Technologies (FSTech) has been awarded a three-year back office system and operations contract by the Texas Department of Transportation (TxDoT).
April 11, 2012 Read time: 1 min
2771 Federal Signal Technologies (FSTech) has been awarded a three-year back office system and operations contract by the 3499 Texas Department of Transportation (TxDoT). The contract, which is valued at US$68 million, also provides for two three-year extensions. FSTech's major sub-contractors are Faneuil and Municipal Services Bureau (MSB).The contract primarily involves three busy TxDoT tollroads in the Austin area. Interoperability with the separate Dallas and Houston area toll systems, plus outlying TxDoT tollroads are also covered by the work."We have partnered with two of the best companies in the business to provide a comprehensive suite of services to TxDoT," commented Manfred Rietsch, president of FSTech. MSB's Toll Division will be providing customer service and TxTag management, while Faneuil will be providing plaza and road operations support."We are pleased at the confidence the Texas Department of Transportation has shown in awarding FSTech this important contract. One of our business lines, VESystems, developed and installed the current back office system in 2006. This contract includes a major upgrade to this system," added Rietsch.

For more information on companies in this article

Related Content

  • Kapsch TrafficCom’s the Tolling Wizard of Oz
    April 4, 2014
    Standfirst: Leading tolling technology solution manufacturer Kapsch TrafficCom has recently been appointed to deliver two major electronic tolling projects in Australia, as Guy Woodford reports Kapsch TrafficCom’s new key Australian contracts will see the Austrian firm use its multi-lane free-flow (MLFF) single gantry solution on the Eastern Distributor toll road in Sydney and the Legacy Way toll road in Brisbane. The MLFF single gantry solution includes innovative stereoscopic vehicle detection and classi
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Firmly in control with communications
    May 6, 2020
    An important step has been made with regard to improving data communications between construction machines
  • Jennifer Rumsey to succeed Tom Linebarger as Cummins president and CEO
    July 15, 2022
    Jennifer Rumsey is to succeed Tom Linebarger as Cummins president and CEO.