Skip to main content

FSTech awarded TxDoT back office operations contract

Federal Signal Technologies (FSTech) has been awarded a three-year back office system and operations contract by the Texas Department of Transportation (TxDoT).
April 11, 2012 Read time: 1 min
2771 Federal Signal Technologies (FSTech) has been awarded a three-year back office system and operations contract by the 3499 Texas Department of Transportation (TxDoT). The contract, which is valued at US$68 million, also provides for two three-year extensions. FSTech's major sub-contractors are Faneuil and Municipal Services Bureau (MSB).The contract primarily involves three busy TxDoT tollroads in the Austin area. Interoperability with the separate Dallas and Houston area toll systems, plus outlying TxDoT tollroads are also covered by the work."We have partnered with two of the best companies in the business to provide a comprehensive suite of services to TxDoT," commented Manfred Rietsch, president of FSTech. MSB's Toll Division will be providing customer service and TxTag management, while Faneuil will be providing plaza and road operations support."We are pleased at the confidence the Texas Department of Transportation has shown in awarding FSTech this important contract. One of our business lines, VESystems, developed and installed the current back office system in 2006. This contract includes a major upgrade to this system," added Rietsch.

For more information on companies in this article

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Texas set to approve extension to Texas 249 and US 290 in 2016
    January 5, 2016
    The Texas Department of Transportation is poised to give the go-ahead to US$1.27 billion worth of freeway to start this year. Plans include extensions to Texas 249 and US 290 in order to give Waller County greater access to major freeways and tollways, according to media reports. The biggest project, which is expected to begin this summer, is the addition of toll lanes to Texas 288, costing $800 million. Work will also be carried out at interchanges between the 288 toll road, Loop 610 and the Sam Hous
  • IRD wins nation-wide FHWA contract
    March 1, 2012
    International Road Dynamics (IRD) has been awarded a contract for "weigh-in-motion (WIM) systems maintenance and data services" by the US Department of Transportation, Federal Highway Administration (FHWA).