Skip to main content

Fraser Crossing Partners chosen for new Pattullo Bridge in Canada

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
By David Arminas February 25, 2020 Read time: 2 mins
Artist impression of planned Pattullo Bridge replacement near Vancouver, Canada (photo courtesy of BC Ministry of Transportation and Infrastructure)

The consortium Fraser Crossing Partners has landed a US$730 million construction contract to expand the Pattullo Bridge in greater Vancouver, Canada.

The bridge will be built alongside the old 1.2km Pattullo Bridge over the Fraser River to connect the cities of New Westminster and Surrey. Construction is scheduled to start in 2020 with completion in late 2023, after which the old bridge will be demolished.

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors with long-span bridge design by SNC-Lavalin, Leonhardt, Andrä und Partner Beratende Ingenieure, Hatch Corporation, EXP Services and Acciona Infrastructure Canada.

SNC-Lavalin was originally a main partner but withdrew from the main procurement process due to a strategic decision to avoid fixed-price projects. Aecon took its place.

The other two consortia shortlists in early 2019 were Fraser Community Connectors and the Flatiron/Dragados/Carlson Pattullo joint venture.

Fraser Community Connectors consisted of Kiewit Canada Development, Kiewit Infrastructure BC, TY Lin International and International Bridge Technologies.

Flatiron/Dragados/Carlson Pattullo was a JV of Flatiron Constructors Canada, Dragados Canada and Carlson Construction Group, ACS Infrastructure Canada, Hochtieff PPP Solutions North America and Cowi North America.

The design-build-finance contract, awarded by the province British Columbia, is part of $1.08 allocated for the overall project that includes financing, management and property purchases and removal of the old bridge.

The new four-lane bridge also features dedicated pedestrian and cyclist lanes separated from traffic by a barrier on both sides of the bridge.

The existing 1.2km through-arch Pattullo Bridge – named after a provincial premier – was built in 1937. It handles an average of almost 80,000 vehicles a day, about 20% of traffic across the Fraser River. But it has no dividing barrier so the structure has been prone to closures after head-on collisions.

Related Content

  • Massey Bridge concession popular
    October 10, 2016
    The concession package for the Massey Bridge in Canada is proving popular, with several firms keen to win the deal. Three consortia are in the running for the bridge project, which is intended to replace the existing George Massey Tunnel.
  • SSL hits back over criticism of its work on the Champlain Bridge
    December 11, 2017
    The contactor building the replacement Champlain Bridge in Canada has hit back over of allegations of poor workmanship in the US$3.3 billion project. The new 3.4km cable-stayed Champlain Bridge over the St Lawrence River will have six lanes vehicle lanes and a separate cycle and pedestrian lane. Design life is 125 years and is being constructed under a public-private partnership and operating contract of 30 years after completion of construction. Work includes construction of a smaller bridge for Île des
  • More cash for BC Trans-Canada upgrades
    August 30, 2024
    Procurement for phase 3B of the Highway 1 improvements, between Langley and Abbotsford, in the Canadian province of British Columbia will start next year.
  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.