Skip to main content

Fraser Crossing Partners chosen for new Pattullo Bridge in Canada

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
By David Arminas February 25, 2020 Read time: 2 mins
Artist impression of planned Pattullo Bridge replacement near Vancouver, Canada (photo courtesy of BC Ministry of Transportation and Infrastructure)

The consortium Fraser Crossing Partners has landed a US$730 million construction contract to expand the Pattullo Bridge in greater Vancouver, Canada.

The bridge will be built alongside the old 1.2km Pattullo Bridge over the Fraser River to connect the cities of New Westminster and Surrey. Construction is scheduled to start in 2020 with completion in late 2023, after which the old bridge will be demolished.

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors with long-span bridge design by SNC-Lavalin, Leonhardt, Andrä und Partner Beratende Ingenieure, Hatch Corporation, EXP Services and Acciona Infrastructure Canada.

SNC-Lavalin was originally a main partner but withdrew from the main procurement process due to a strategic decision to avoid fixed-price projects. Aecon took its place.

The other two consortia shortlists in early 2019 were Fraser Community Connectors and the Flatiron/Dragados/Carlson Pattullo joint venture.

Fraser Community Connectors consisted of Kiewit Canada Development, Kiewit Infrastructure BC, TY Lin International and International Bridge Technologies.

Flatiron/Dragados/Carlson Pattullo was a JV of Flatiron Constructors Canada, Dragados Canada and Carlson Construction Group, ACS Infrastructure Canada, Hochtieff PPP Solutions North America and Cowi North America.

The design-build-finance contract, awarded by the province British Columbia, is part of $1.08 allocated for the overall project that includes financing, management and property purchases and removal of the old bridge.

The new four-lane bridge also features dedicated pedestrian and cyclist lanes separated from traffic by a barrier on both sides of the bridge.

The existing 1.2km through-arch Pattullo Bridge – named after a provincial premier – was built in 1937. It handles an average of almost 80,000 vehicles a day, about 20% of traffic across the Fraser River. But it has no dividing barrier so the structure has been prone to closures after head-on collisions.

Related Content

  • Massive German road investment required
    March 5, 2025
    German is requiring a massive investment in road development.
  • Fluor team selected for South Carolina port access road project
    April 27, 2016
    A consortium led by Fluor has been selected by South Carolina’s Department of Transportation to design and build the Port Access Road Project in Charleston. The project, in one of the US’s fastest growing container ports, will provide direct access between the proposed marine container terminal to be on the former naval base and Interstate 26.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.