Skip to main content

Fraser Crossing Partners chosen for new Pattullo Bridge in Canada

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
By David Arminas February 25, 2020 Read time: 2 mins
Artist impression of planned Pattullo Bridge replacement near Vancouver, Canada (photo courtesy of BC Ministry of Transportation and Infrastructure)

The consortium Fraser Crossing Partners has landed a US$730 million construction contract to expand the Pattullo Bridge in greater Vancouver, Canada.

The bridge will be built alongside the old 1.2km Pattullo Bridge over the Fraser River to connect the cities of New Westminster and Surrey. Construction is scheduled to start in 2020 with completion in late 2023, after which the old bridge will be demolished.

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors with long-span bridge design by SNC-Lavalin, Leonhardt, Andrä und Partner Beratende Ingenieure, Hatch Corporation, EXP Services and Acciona Infrastructure Canada.

SNC-Lavalin was originally a main partner but withdrew from the main procurement process due to a strategic decision to avoid fixed-price projects. Aecon took its place.

The other two consortia shortlists in early 2019 were Fraser Community Connectors and the Flatiron/Dragados/Carlson Pattullo joint venture.

Fraser Community Connectors consisted of Kiewit Canada Development, Kiewit Infrastructure BC, TY Lin International and International Bridge Technologies.

Flatiron/Dragados/Carlson Pattullo was a JV of Flatiron Constructors Canada, Dragados Canada and Carlson Construction Group, ACS Infrastructure Canada, Hochtieff PPP Solutions North America and Cowi North America.

The design-build-finance contract, awarded by the province British Columbia, is part of $1.08 allocated for the overall project that includes financing, management and property purchases and removal of the old bridge.

The new four-lane bridge also features dedicated pedestrian and cyclist lanes separated from traffic by a barrier on both sides of the bridge.

The existing 1.2km through-arch Pattullo Bridge – named after a provincial premier – was built in 1937. It handles an average of almost 80,000 vehicles a day, about 20% of traffic across the Fraser River. But it has no dividing barrier so the structure has been prone to closures after head-on collisions.

Related Content

  • Construction of the Gordie Howe Bridge could start in mid-2018
    May 12, 2017
    Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Alberta to twin last 215km of Highway 3
    December 6, 2022
    Request for proposals are going ahead for twinning several more sections of Highway 3, a major commercial and trucking route that runs across the western Canadian province.
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.